WindOperatingMISO

Macksburg Wind Project

Wind power plant in Madison County, Iowa. 119.6 MW of nameplate capacity across 1 generator, operated by MidAmerican Energy Co.

Also known as Macksburg Wind Farm · Macksburg · EIA plant 58885

Analyst: free account, 1 question a day.

WintersetSummit LakeCreston Solar (50 MW)Arbor Hill Wind FarmOrient Wind FarmMacksburg Wind Project10 km
Open in the map
6 plants within 27 km, from EIA coordinates.

Key facts

Capacity
119.6 MWNameplate
Generators
1 operatingEIA-860M, August 2026
Operating since
December 2014First generator online
Operator
MidAmerican Energy CoEIA operator ID 12341
Grid
MISOBalancing authority MISO
Price nodes
1 MISO nodeResource nodes with prices
Location
Madison County, IA41.2092, −94.1036
EIA plant ID
58885EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Macksburg Wind Project produces

Free · EIA-923

Net generation, 2025

249 GWh

248,695 MWh, final

Capacity factor, 2025

23.7%

2024: 31.4%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2015 to 2025

248.7–388.9

GWh a year. Low 2025, high 2015

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
2006Not reportedNot reported0 of 12
2007Not reportedNot reported0 of 12
2008Not reportedNot reported0 of 12
2009Not reportedNot reported0 of 12
2010Not reportedNot reported0 of 12
2011Not reportedNot reported0 of 12
2012Not reportedNot reported0 of 12
2013Not reportedNot reported0 of 12
201419,682Not reported1 of 12
2015388,85737.1%12 of 12
2016374,54135.7%12 of 12
2017367,49335.1%12 of 12
2018340,76232.5%12 of 12
2019336,09432.1%12 of 12
2020320,71330.5%12 of 12
2021306,10329.2%12 of 12
2022376,31135.9%12 of 12
2023322,31130.8%12 of 12
2024329,94631.4%12 of 12
2025248,69523.7%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · MISO

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
MBWFOnshore Wind Turbine119.6December 2014

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists MidAmerican Energy Co as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Modeled curtailment

A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.

Modeled

Expected vs reported generation

Monthly modeled expected output and physical potential next to EIA-923 reported output.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Macksburg Wind Project and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Macksburg Wind Project

More plants operated by MidAmerican Energy Co

Questions about Macksburg Wind Project

How much power does Macksburg Wind Project produce?

Macksburg Wind Project reported 248,695 MWh (249 GWh) of net generation in 2025, a 23.7% capacity factor on 119.6 MW of nameplate capacity.

Where is Macksburg Wind Project?

Macksburg Wind Project is in Madison County, Iowa, at 41.2092, −94.1036. It is in the Midcontinent Independent Transmission System Operator, Inc.. balancing area (MISO).

Who operates Macksburg Wind Project?

EIA-860M for August 2026 lists MidAmerican Energy Co as the operator (EIA operator ID 12341). The operator is not always the owner.

When did Macksburg Wind Project start operating?

Its first generator began operating in December 2014, according to EIA-860M.

Does InfraMap have power prices for Macksburg Wind Project?

Yes. InfraMap has MISO day-ahead and real-time prices at 1 price node linked to Macksburg Wind Project, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • MISO day-ahead and real-time prices; node and hub assignments as of 2026-10-05
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)
  • Project names from the USGS U.S. Wind Turbine Database

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page