Wildcat Point Generation Facility
Natural gas power plant in Cecil County, Maryland. 1,113.6 MW of nameplate capacity across 3 generators, operated by Old Dominion Electric Coop.
Also known as EIA plant 59220
Analyst: free account, 1 question a day.
Key facts
- Capacity
- 1,113.6 MWNameplate
- Generators
- 3 operatingEIA-860M, August 2026
- Operating since
- April 2018First generator online
- Operator
- Old Dominion Electric CoopEIA operator ID 40229
- Grid
- PJMBalancing authority PJM
- Price nodes
- 3 PJM nodesResource nodes with prices
- Location
- Cecil County, MD39.7194, −76.1616
- EIA plant ID
- 59220EIA plant page
Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.
How much power Wildcat Point Generation Facility produces
Free · EIA-923Net generation, 2025
3.33 TWh
3,333,444 MWh, final
Capacity factor, 2025
Not reported
2024: 30.3%
January to July 2026
1.56 TWh
Provisional
Range, 2018 to 2025
3.0–4.4
TWh a year. Low 2024, high 2023
| Year | Net generation, MWh | Capacity factor | Months reported |
|---|---|---|---|
| 2000 | Not reported | Not reported | 0 of 12 |
| 2001 | Not reported | Not reported | 0 of 12 |
| 2002 | Not reported | Not reported | 0 of 12 |
| 2003 | Not reported | Not reported | 0 of 12 |
| 2004 | Not reported | Not reported | 0 of 12 |
| 2005 | Not reported | Not reported | 0 of 12 |
| 2006 | Not reported | Not reported | 0 of 12 |
| 2007 | Not reported | Not reported | 0 of 12 |
| 2008 | Not reported | Not reported | 0 of 12 |
| 2009 | Not reported | Not reported | 0 of 12 |
| 2010 | Not reported | Not reported | 0 of 12 |
| 2011 | Not reported | Not reported | 0 of 12 |
| 2012 | Not reported | Not reported | 0 of 12 |
| 2013 | Not reported | Not reported | 0 of 12 |
| 2014 | Not reported | Not reported | 0 of 12 |
| 2015 | Not reported | Not reported | 0 of 12 |
| 2016 | Not reported | Not reported | 0 of 12 |
| 2017 | 245,838 | Not reported | 6 of 12 |
| 2018 | 3,785,265 | Not reported | 12 of 12 |
| 2019 | 3,351,020 | 34.4% | 12 of 12 |
| 2020 | 3,023,097 | 30.9% | 12 of 12 |
| 2021 | 3,462,345 | 35.5% | 12 of 12 |
| 2022 | 3,922,629 | 40.2% | 12 of 12 |
| 2023 | 4,424,853 | Not reported | 12 of 12 |
| 2024 | 2,968,185 | 30.3% | 12 of 12 |
| 2025 | 3,333,444 | Not reported | 12 of 12 |
| 2026 (provisional, partial year) | 1,564,940 | 27.6% | 7 of 7 |
* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.
Power prices and basis
Free account · PJMEmissions
Free · EPA CAMPDCO₂, 2025
1.40M
US short tons. 2024: 1.25M
SO₂, 2025
7
US short tons
NOx, 2025
103
US short tons
CO₂ per MWh, calculated
0.42 t
About 838 lb per MWh
2 of 2 EPA units reported CO₂ in 2025 (CT1, CT2), matched to EIA plant 59220 through the EPA–EIA crosswalk. The per-MWh rate is EPA CO₂ divided by EIA-923 net generation. The two reporting boundaries can differ.
Water use
Free · EIA-923 cooling, USGSWithdrawal, 2024
676
million gallons
Consumption, 2024
658
million gallons
Source
Susquehanna River
Surface, Fresh. Induced-draft tower
Watershed stress
Very low/none · 0.110
USGS SUI, HUC12 Conowingo Creek
12 of 12 cooling months report withdrawal. SUI of the HUC12 containing the plant. Blank volumes are unreported, not zero.
Generators
Free · EIA-860M| Generator | Technology | Nameplate MW | Online since |
|---|---|---|---|
| CT1 | Natural Gas Fired Combined Cycle | 310.3 | April 2018 |
| CT2 | Natural Gas Fired Combined Cycle | 310.3 | April 2018 |
| ST1 | Natural Gas Fired Combined Cycle | 493.0 | April 2018 |
Ownership and offtake
ProOwnership and offtake are part of Pro
Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Old Dominion Electric Coop as the operator, which is not always the owner.
Modeled data
ProPro adds modeled values for this plant. Everything above stays free.
Generation potential vs reported
Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.
300 analyst questions a month, plus MCP
Query Wildcat Point Generation Facility and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.
Power plants near Wildcat Point Generation Facility
More plants operated by Old Dominion Electric Coop
Questions about Wildcat Point Generation Facility
How much power does Wildcat Point Generation Facility produce?
Wildcat Point Generation Facility reported 3,333,444 MWh (3.33 TWh) of net generation in 2025. From January to July 2026 it reported 1.56 TWh, which is provisional.
Where is Wildcat Point Generation Facility?
Wildcat Point Generation Facility is in Cecil County, Maryland, at 39.7194, −76.1616. It is in the PJM Interconnection, LLC balancing area (PJM).
Who operates Wildcat Point Generation Facility?
EIA-860M for August 2026 lists Old Dominion Electric Coop as the operator (EIA operator ID 40229). The operator is not always the owner.
When did Wildcat Point Generation Facility start operating?
Its first generator began operating in April 2018, according to EIA-860M.
Does InfraMap have power prices for Wildcat Point Generation Facility?
Yes. InfraMap has PJM day-ahead and real-time prices at 3 price nodes linked to Wildcat Point Generation Facility, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.
Sources
- EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
- EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
- EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
- PJM day-ahead and real-time prices; node and hub assignments as of 2026-10-05
- EIA-923 cooling water 2024 and the USGS surface water supply and use index, Water years 2010-2020 (Oct 2009 to Sep 2020), mean of monthly values
Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page