Natural gasOperatingPJM

York Energy Center

Natural gas power plant in York County, Pennsylvania. 1,449.4 MW of nameplate capacity across 7 generators, operated by Calpine Mid-Merit LLC.

Also known as Delta Plant · EIA plant 55524

Analyst: free account, 1 question a day.

Peach BottomMuddy RunHoltwoodWildcat Point Generation FacilityConowingoYork5 km
Open in the map
6 plants within 14 km, from EIA coordinates.

Key facts

Capacity
1,449.4 MWNameplate
Generators
7 operatingEIA-860M, August 2026
Operating since
March 2011First generator online
Operator
Calpine Mid-Merit LLCEIA operator ID 56608
Grid
PJMBalancing authority PJM
Price nodes
7 PJM nodesResource nodes with prices
Location
York County, PA39.7375, −76.3067
EIA plant ID
55524EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power York produces

Free · EIA-923

Net generation, 2025

8.79 TWh

8,785,592 MWh, final

Capacity factor, 2025

69.2%

2024: 71.9%

January to July 2026

5.41 TWh

Provisional

Range, 2015 to 2025

1.6–9.2

TWh a year. Low 2016, high 2024

Annual net generation, TWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
2006Not reportedNot reported0 of 12
2007Not reportedNot reported0 of 12
2008Not reportedNot reported0 of 12
2009Not reportedNot reported0 of 12
2010Not reportedNot reported0 of 12
20111,106,35429.9%9 of 12
20123,483,38770.8%12 of 12
20132,018,737Not reported12 of 12
20142,537,26451.7%12 of 12
20151,976,57040.3%12 of 12
20161,552,40131.6%12 of 12
20171,590,271Not reported12 of 12
20181,838,910Not reported12 of 12
20195,340,573Not reported12 of 12
20208,565,78867.3%12 of 12
20217,648,98460.2%12 of 12
20227,125,25056.1%12 of 12
20238,631,40568.0%12 of 12
20249,155,26771.9%12 of 12
20258,785,59269.2%12 of 12
2026 (provisional, partial year)5,410,89073.4%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · PJM

Emissions

Free · EPA CAMPD

CO₂, 2025

1.57M

US short tons. 2024: 1.56M

SO₂, 2025

8

US short tons

NOx, 2025

66

US short tons

CO₂ per MWh, calculated

0.18 t

About 357 lb per MWh

3 of 3 EPA units reported CO₂ in 2025 (1, 2, 3), matched to EIA plant 55524 through the EPA–EIA crosswalk. The per-MWh rate is EPA CO₂ divided by EIA-923 net generation. The two reporting boundaries can differ.

Water use

Free · EIA-923 cooling, USGS

Withdrawal, 2024

2,679

million gallons

Consumption, 2024

2,093

million gallons

Source

Conowingo Pool

Surface, Fresh. Induced-draft tower

Watershed stress

Very low/none · 0.123

USGS SUI, HUC12 Fishing Creek-Susquehanna River

12 of 12 cooling months report withdrawal. SUI of the HUC12 containing the plant. Blank volumes are unreported, not zero.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
CTG1Natural Gas Fired Combined Cycle120.0March 2011
CTG2Natural Gas Fired Combined Cycle120.0March 2011
CTG3Natural Gas Fired Combined Cycle120.0March 2011
CTG5Natural Gas Fired Combined Cycle234.9March 2019
CTG6Natural Gas Fired Combined Cycle234.9March 2019
STG1Natural Gas Fired Combined Cycle200.0March 2011
STG2Natural Gas Fired Combined Cycle419.6March 2019

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Calpine Mid-Merit LLC as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query York Energy Center and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near York

Questions about York

How much power does York Energy Center produce?

York Energy Center reported 8,785,592 MWh (8.79 TWh) of net generation in 2025, a 69.2% capacity factor on 1,449.4 MW of nameplate capacity. From January to July 2026 it reported 5.41 TWh, which is provisional.

Where is York Energy Center?

York Energy Center is in York County, Pennsylvania, at 39.7375, −76.3067. It is in the PJM Interconnection, LLC balancing area (PJM).

Who operates York Energy Center?

EIA-860M for August 2026 lists Calpine Mid-Merit LLC as the operator (EIA operator ID 56608). The operator is not always the owner.

When did York Energy Center start operating?

Its first generator began operating in March 2011, according to EIA-860M.

Does InfraMap have power prices for York Energy Center?

Yes. InfraMap has PJM day-ahead and real-time prices at 7 price nodes linked to York Energy Center, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
  • PJM day-ahead and real-time prices; node and hub assignments as of 2026-10-05
  • EIA-923 cooling water 2024 and the USGS surface water supply and use index, Water years 2010-2020 (Oct 2009 to Sep 2020), mean of monthly values
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page