Natural gasOperatingPJM

Edge Moor

Natural gas power plant in New Castle County, Delaware. 697.8 MW of nameplate capacity across 3 generators, operated by Calpine Mid-Atlantic Generation LLC.

Also known as Edge Moor Power Plant · EIA plant 593

Analyst: free account, 1 question a day.

Hay RoadDD Hay Road Solar 23 LLCWHA Southbridge Solar Park CSGCroda Atlas Point CHPSouth Campus SolarEdge Moor2 km
Open in the map
5 plants within 6.1 km, from EIA coordinates.

Key facts

Capacity
697.8 MWNameplate
Generators
3 operatingEIA-860M, August 2026
Operating since
December 1954First generator online
Operator
Calpine Mid-Atlantic Generation LLCEIA operator ID 56609
Grid
PJMBalancing authority PJM
Price nodes
3 PJM nodesResource nodes with prices
Location
New Castle County, DE39.7389, −75.5038
EIA plant ID
593EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Edge Moor produces

Free · EIA-923

Net generation, 2025

391 GWh

391,344 MWh, final

Capacity factor, 2025

6.3%

2024: 5.3%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2016 to 2025

137.8–865.2

GWh a year. Low 2019, high 2016

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
20001,765,719Not reported12 of 12
20012,598,467Not reported12 of 12
20021,911,750Not reported12 of 12
20032,400,037Not reported12 of 12
20041,828,434Not reported12 of 12
20051,762,130Not reported12 of 12
20061,538,808Not reported12 of 12
20071,815,336Not reported12 of 12
2008Not reportedNot reported0 of 12
2009582,120Not reported12 of 12
201088,5555.6%3 of 12
2011631,164Not reported11 of 12
20121,075,55917.2%12 of 12
2013395,5626.4%12 of 12
2014170,3988.3%4 of 12
2015165,2625.3%6 of 12
2016865,18113.9%12 of 12
2017232,1463.7%12 of 12
2018312,9655.0%12 of 12
2019137,8392.2%12 of 12
2020175,4792.8%12 of 12
2021292,4564.7%12 of 12
2022339,9375.5%12 of 12
2023222,2943.6%12 of 12
2024327,5625.3%12 of 12
2025391,3446.3%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · PJM

Emissions

Free · EPA CAMPD

CO₂, 2025

Not reported

US short tons. 2024: Not reported

SO₂, 2025

Not reported

US short tons

NOx, 2025

164

US short tons

3 of 4 EPA units reported CO₂ in 2025 (10, 3, 4, 5), matched to EIA plant 593 through the EPA–EIA crosswalk.

Water use

Free · EIA-923 cooling, USGS

Withdrawal, 2024

31,891

million gallons

Consumption, 2024

110

million gallons

Source

Delaware River

Surface, Fresh. Once-through

Watershed stress

Very low/none · 0.138

USGS SUI, HUC12 Shellpot Creek-Frontal Delaware River

36 of 36 cooling months report withdrawal. SUI of the source river HUC12 within 3 km. Blank volumes are unreported, not zero.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
3Natural Gas Steam Turbine75.0December 1954
4Natural Gas Steam Turbine176.8April 1966
5Natural Gas Steam Turbine446.0August 1973

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Calpine Mid-Atlantic Generation LLC as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Edge Moor and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Edge Moor

More plants operated by Calpine Mid-Atlantic Generation LLC

Questions about Edge Moor

How much power does Edge Moor produce?

Edge Moor reported 391,344 MWh (391 GWh) of net generation in 2025, a 6.3% capacity factor on 697.8 MW of nameplate capacity.

Where is Edge Moor?

Edge Moor is in New Castle County, Delaware, at 39.7389, −75.5038. It is in the PJM Interconnection, LLC balancing area (PJM).

Who operates Edge Moor?

EIA-860M for August 2026 lists Calpine Mid-Atlantic Generation LLC as the operator (EIA operator ID 56609). The operator is not always the owner.

When did Edge Moor start operating?

Its first generator began operating in December 1954, according to EIA-860M.

Does InfraMap have power prices for Edge Moor?

Yes. InfraMap has PJM day-ahead and real-time prices at 3 price nodes linked to Edge Moor, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
  • PJM day-ahead and real-time prices; node and hub assignments as of 2026-10-05
  • EIA-923 cooling water 2024 and the USGS surface water supply and use index, Water years 2010-2020 (Oct 2009 to Sep 2020), mean of monthly values
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page