SolarOperatingCAISO

Adelanto Solar II, LLC

Solar power plant in San Bernardino County, California. 7 MW of nameplate capacity across 1 generator, operated by Adelanto Solar II, LLC.

Also known as EIA plant 59440

Analyst: free account, 1 question a day.

Expressway Solar AHigh Desert Power PlantExpressway Solar BVictor Mesa Linda B2Adelanto Solar II2 km
Open in the map
6 plants within 5.0 km, from EIA coordinates.

Key facts

Capacity
7 MWNameplate
Generators
1 operatingEIA-860M, August 2026
Operating since
July 2015First generator online
Operator
Adelanto Solar II, LLCEIA operator ID 59212
Grid
CAISOBalancing authority CISO
Price nodes
1 CAISO nodeResource nodes with prices
Location
San Bernardino County, CA34.5572, −117.3775
EIA plant ID
59440EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Adelanto Solar II produces

Free · EIA-923

Net generation, 2025

18.0 GWh

18,023 MWh, final

Capacity factor, 2025

29.4%

2024: 23.5%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2016 to 2025

14.4–18.9

GWh a year. Low 2024, high 2018

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
2006Not reportedNot reported0 of 12
2007Not reportedNot reported0 of 12
2008Not reportedNot reported0 of 12
2009Not reportedNot reported0 of 12
2010Not reportedNot reported0 of 12
2011Not reportedNot reported0 of 12
2012Not reportedNot reported0 of 12
2013Not reportedNot reported0 of 12
2014Not reportedNot reported0 of 12
201510,227Not reported6 of 12
201617,20228.0%12 of 12
201718,56330.3%12 of 12
201818,85330.7%12 of 12
201918,28329.8%12 of 12
202016,40526.7%12 of 12
202117,31528.2%12 of 12
202216,56027.0%12 of 12
202317,01827.8%12 of 12
202414,43323.5%12 of 12
202518,02329.4%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · CAISO

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
SASSolar Photovoltaic7.0July 2015

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Adelanto Solar II, LLC as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Modeled curtailment

A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.

Modeled

Expected vs reported generation

Monthly modeled expected output and physical potential next to EIA-923 reported output.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Adelanto Solar II, LLC and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Adelanto Solar II

Questions about Adelanto Solar II

How much power does Adelanto Solar II, LLC produce?

Adelanto Solar II, LLC reported 18,023 MWh (18.0 GWh) of net generation in 2025, a 29.4% capacity factor on 7 MW of nameplate capacity.

Where is Adelanto Solar II, LLC?

Adelanto Solar II, LLC is in San Bernardino County, California, at 34.5572, −117.3775. It is in the California Independent System Operator balancing area (CISO).

Who operates Adelanto Solar II, LLC?

EIA-860M for August 2026 lists Adelanto Solar II, LLC as the operator (EIA operator ID 59212). The operator is not always the owner.

When did Adelanto Solar II, LLC start operating?

Its first generator began operating in July 2015, according to EIA-860M.

Does InfraMap have power prices for Adelanto Solar II, LLC?

Yes. InfraMap has CAISO day-ahead and real-time prices at 1 price node linked to Adelanto Solar II, LLC, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • CAISO day-ahead and real-time prices; node and hub assignments as of 2026-10-05

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page