SolarOperatingCAISO

Little Bear Solar 1, LLC

Solar power plant in Fresno County, California. 40 MW of nameplate capacity across 1 generator, operated by Little Bear Solar 1, LLC (Longroad).

Also known as EIA plant 59870

Analyst: free account, 1 question a day.

North Star SolarCitizen BLittle Bear Solar 11 km
Open in the map
5 plants within 1.8 km, from EIA coordinates.

Key facts

Capacity
40 MWNameplate
Generators
1 operatingEIA-860M, August 2026
Operating since
December 2020First generator online
Operator
Little Bear Solar 1, LLC (Longroad)EIA operator ID 65902
Grid
CAISOBalancing authority CISO
Price nodes
1 CAISO nodeResource nodes with prices
Location
Fresno County, CA36.7160, −120.4150
EIA plant ID
59870EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Little Bear Solar 1 produces

Free · EIA-923

Net generation, 2025

63.0 GWh

62,993 MWh, final

Capacity factor, 2025

18.0%

2024: 23.4%

January to July 2026

51.5 GWh

Provisional

Range, 2021 to 2025

63.0–93.1

GWh a year. Low 2025, high 2021

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
2006Not reportedNot reported0 of 12
2007Not reportedNot reported0 of 12
2008Not reportedNot reported0 of 12
2009Not reportedNot reported0 of 12
2010Not reportedNot reported0 of 12
2011Not reportedNot reported0 of 12
2012Not reportedNot reported0 of 12
2013Not reportedNot reported0 of 12
2014Not reportedNot reported0 of 12
2015Not reportedNot reported0 of 12
2016Not reportedNot reported0 of 12
2017Not reportedNot reported0 of 12
2018Not reportedNot reported0 of 12
2019Not reportedNot reported0 of 12
20204,662Not reported1 of 12
202193,13326.6%12 of 12
202281,71723.3%12 of 12
202370,52720.1%12 of 12
202482,20423.4%12 of 12
202562,99318.0%12 of 12
2026 (provisional, partial year)51,48825.3%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · CAISO

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
GEN01Solar Photovoltaic40.0December 2020

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Little Bear Solar 1, LLC (Longroad) as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Modeled curtailment

A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.

Modeled

Expected vs reported generation

Monthly modeled expected output and physical potential next to EIA-923 reported output.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Little Bear Solar 1, LLC and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Little Bear Solar 1

Questions about Little Bear Solar 1

How much power does Little Bear Solar 1, LLC produce?

Little Bear Solar 1, LLC reported 62,993 MWh (63.0 GWh) of net generation in 2025, a 18.0% capacity factor on 40 MW of nameplate capacity. From January to July 2026 it reported 51.5 GWh, which is provisional.

Where is Little Bear Solar 1, LLC?

Little Bear Solar 1, LLC is in Fresno County, California, at 36.7160, −120.4150. It is in the California Independent System Operator balancing area (CISO).

Who operates Little Bear Solar 1, LLC?

EIA-860M for August 2026 lists Little Bear Solar 1, LLC (Longroad) as the operator (EIA operator ID 65902). The operator is not always the owner.

When did Little Bear Solar 1, LLC start operating?

Its first generator began operating in December 2020, according to EIA-860M.

Does InfraMap have power prices for Little Bear Solar 1, LLC?

Yes. InfraMap has CAISO day-ahead and real-time prices at 1 price node linked to Little Bear Solar 1, LLC, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • CAISO day-ahead and real-time prices; node and hub assignments as of 2026-10-05

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page