SolarOperatingMISO

Marshall Solar Energy Project

Solar power plant in Lyon County, Minnesota. 62.3 MW of nameplate capacity across 1 generator, operated by Marshall Solar Energy Project.

Also known as EIA plant 59875

Analyst: free account, 1 question a day.

Marshall (MN)Novel Shelly Solar LLC (CSG)USS Wolf Solar LLCMarshall Wind 4 LLCMarshall Wind 3 LLCMarshall Solar Energy…10 km
Open in the map
6 plants within 20 km, from EIA coordinates.

Key facts

Capacity
62.3 MWNameplate
Generators
1 operatingEIA-860M, August 2026
Operating since
January 2017First generator online
Operator
Marshall Solar Energy ProjectEIA operator ID 59973
Grid
MISOBalancing authority MISO
Price nodes
1 MISO nodeResource nodes with prices
Location
Lyon County, MN44.4753, −95.6690
EIA plant ID
59875EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Marshall Solar Energy Project produces

Free · EIA-923

Net generation, 2025

96.6 GWh

96,573 MWh, final

Capacity factor, 2025

17.7%

2024: 16.0%

January to July 2026

62.9 GWh

Provisional

Range, 2017 to 2025

87.4–111.7

GWh a year. Low 2024, high 2017

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
2006Not reportedNot reported0 of 12
2007Not reportedNot reported0 of 12
2008Not reportedNot reported0 of 12
2009Not reportedNot reported0 of 12
2010Not reportedNot reported0 of 12
2011Not reportedNot reported0 of 12
2012Not reportedNot reported0 of 12
2013Not reportedNot reported0 of 12
2014Not reportedNot reported0 of 12
2015Not reportedNot reported0 of 12
2016Not reportedNot reported0 of 12
2017111,708Not reported12 of 12
2018107,40819.7%12 of 12
201996,63417.7%12 of 12
2020104,39019.1%12 of 12
202197,31417.8%12 of 12
2022101,20818.5%12 of 12
2023104,26319.1%12 of 12
202487,42216.0%12 of 12
202596,57317.7%12 of 12
2026 (provisional, partial year)62,93519.9%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · MISO

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
PV1Solar Photovoltaic62.3January 2017

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Marshall Solar Energy Project as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Modeled curtailment

A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.

Modeled

Expected vs reported generation

Monthly modeled expected output and physical potential next to EIA-923 reported output.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Marshall Solar Energy Project and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Marshall Solar Energy Project

Questions about Marshall Solar Energy Project

How much power does Marshall Solar Energy Project produce?

Marshall Solar Energy Project reported 96,573 MWh (96.6 GWh) of net generation in 2025, a 17.7% capacity factor on 62.3 MW of nameplate capacity. From January to July 2026 it reported 62.9 GWh, which is provisional.

Where is Marshall Solar Energy Project?

Marshall Solar Energy Project is in Lyon County, Minnesota, at 44.4753, −95.6690. It is in the Midcontinent Independent Transmission System Operator, Inc.. balancing area (MISO).

Who operates Marshall Solar Energy Project?

EIA-860M for August 2026 lists Marshall Solar Energy Project as the operator (EIA operator ID 59973). The operator is not always the owner.

When did Marshall Solar Energy Project start operating?

Its first generator began operating in January 2017, according to EIA-860M.

Does InfraMap have power prices for Marshall Solar Energy Project?

Yes. InfraMap has MISO day-ahead and real-time prices at 1 price node linked to Marshall Solar Energy Project, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • MISO day-ahead and real-time prices; node and hub assignments as of 2026-10-05

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page