CoalOperatingSPP

Whelan Energy Center

Coal power plant in Adams County, Nebraska. 324.3 MW of nameplate capacity across 2 generators, operated by City of Hastings - (NE).

Also known as EIA plant 60

Analyst: free account, 1 question a day.

CCC Hastings Wind TurbineHastings Community So…City Light & WaterPlatteLittle Blue Wind Proj…C W BurdickWhelan20 km
Open in the map
6 plants within 38 km, from EIA coordinates.

Key facts

Capacity
324.3 MWNameplate
Generators
2 operatingEIA-860M, August 2026
Operating since
July 1981First generator online
Operator
City of Hastings - (NE)EIA operator ID 8245
Grid
SPPBalancing authority SWPP
Price nodes
2 SPP nodesResource nodes with prices
Location
Adams County, NE40.5809, −98.3124
EIA plant ID
60EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Whelan produces

Free · EIA-923

Net generation, 2025

1.31 TWh

1,314,761 MWh, final

Capacity factor, 2025

46.3%

2024: 41.3%

January to July 2026

720 GWh

Provisional

Range, 2016 to 2025

1.1–1.6

TWh a year. Low 2023, high 2022

Annual net generation, TWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000528,987Not reported12 of 12
2001539,084Not reported12 of 12
2002485,145Not reported12 of 12
2003539,729Not reported12 of 12
2004548,784Not reported12 of 12
2005549,296Not reported12 of 12
2006535,556Not reported12 of 12
2007497,342Not reported12 of 12
2008524,712Not reported12 of 12
2009466,497Not reported12 of 12
2010474,43971.0%12 of 12
20111,528,004Not reported12 of 12
20121,361,07947.8%12 of 12
20131,781,91362.7%12 of 12
20141,673,67158.9%12 of 12
201553,69323.0%1 of 12
20161,253,698Not reported12 of 12
20171,164,41441.0%12 of 12
20181,377,426Not reported12 of 12
20191,417,60949.9%12 of 12
2020905,54134.7%11 of 12
20211,299,36745.7%12 of 12
20221,567,873Not reported12 of 12
20231,095,50238.6%12 of 12
20241,177,28441.3%12 of 12
20251,314,76146.3%12 of 12
2026 (provisional, partial year)720,39643.7%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · SPP

Emissions

Free · EPA CAMPD

CO₂, 2025

1.50M

US short tons. 2024: 1.30M

SO₂, 2025

1,926

US short tons

NOx, 2025

814

US short tons

CO₂ per MWh, calculated

1.14 t

About 2,287 lb per MWh

2 of 2 EPA units reported CO₂ in 2025 (1, 2), matched to EIA plant 60 through the EPA–EIA crosswalk. The per-MWh rate is EPA CO₂ divided by EIA-923 net generation. The two reporting boundaries can differ.

Water use

Free · EIA-923 cooling, USGS

Withdrawal, 2024

733

million gallons

Consumption, 2024

528

million gallons

Source

Wells

Ground, Fresh. Induced-draft tower

Watershed stress

High · 0.648

USGS SUI, HUC12 Outlet Pawnee Creek

24 of 24 cooling months report withdrawal. Groundwater user; SUI describes surface water and is context only. Blank volumes are unreported, not zero.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
1Conventional Steam Coal76.3July 1981
2Conventional Steam Coal248.0June 2011

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists City of Hastings - (NE) as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Whelan Energy Center and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Whelan

More plants operated by City of Hastings - (NE)

Questions about Whelan

How much power does Whelan Energy Center produce?

Whelan Energy Center reported 1,314,761 MWh (1.31 TWh) of net generation in 2025, a 46.3% capacity factor on 324.3 MW of nameplate capacity. From January to July 2026 it reported 720 GWh, which is provisional.

Where is Whelan Energy Center?

Whelan Energy Center is in Adams County, Nebraska, at 40.5809, −98.3124. It is in the Southwest Power Pool balancing area (SWPP).

Who operates Whelan Energy Center?

EIA-860M for August 2026 lists City of Hastings - (NE) as the operator (EIA operator ID 8245). The operator is not always the owner.

When did Whelan Energy Center start operating?

Its first generator began operating in July 1981, according to EIA-860M.

Does InfraMap have power prices for Whelan Energy Center?

Yes. InfraMap has SPP day-ahead and real-time prices at 2 price nodes linked to Whelan Energy Center, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
  • SPP day-ahead and real-time prices; node and hub assignments as of 2026-10-05
  • EIA-923 cooling water 2024 and the USGS surface water supply and use index, Water years 2010-2020 (Oct 2009 to Sep 2020), mean of monthly values

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page