TWE Chocowinity Solar, LLC
Solar power plant in Beaufort County, North Carolina. 4.5 MW of nameplate capacity across 1 generator, operated by Cypress Creek Renewables.
Also known as TWE Chocowinity Solar · EIA plant 60048
Analyst: free account, 1 question a day.
Key facts
- Capacity
- 4.5 MWNameplate
- Generators
- 1 operatingEIA-860M, August 2026
- Operating since
- December 2015First generator online
- Operator
- Cypress Creek RenewablesEIA operator ID 61060
- Grid
- DUKBalancing authority DUK
- Price nodes
- None linkedNo verified ISO node
- Location
- Beaufort County, NC35.5017, −77.1056
- EIA plant ID
- 60048EIA plant page
Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.
How much power TWE Chocowinity Solar produces
Free · EIA-923Net generation, 2025
5.61 GWh
5,609 MWh, final
Capacity factor, 2025
14.2%
2024: 15.0%
January to July 2026
Not reported
Provisional. 0 of 7 months reported
Range, 2016 to 2025
5.6–7.3
GWh a year. Low 2025, high 2017
| Year | Net generation, MWh | Capacity factor | Months reported |
|---|---|---|---|
| 2000 | Not reported | Not reported | 0 of 12 |
| 2001 | Not reported | Not reported | 0 of 12 |
| 2002 | Not reported | Not reported | 0 of 12 |
| 2003 | Not reported | Not reported | 0 of 12 |
| 2004 | Not reported | Not reported | 0 of 12 |
| 2005 | Not reported | Not reported | 0 of 12 |
| 2006 | Not reported | Not reported | 0 of 12 |
| 2007 | Not reported | Not reported | 0 of 12 |
| 2008 | Not reported | Not reported | 0 of 12 |
| 2009 | Not reported | Not reported | 0 of 12 |
| 2010 | Not reported | Not reported | 0 of 12 |
| 2011 | Not reported | Not reported | 0 of 12 |
| 2012 | Not reported | Not reported | 0 of 12 |
| 2013 | Not reported | Not reported | 0 of 12 |
| 2014 | Not reported | Not reported | 0 of 12 |
| 2015 | 117 | Not reported | 1 of 12 |
| 2016 | 6,998 | 17.7% | 12 of 12 |
| 2017 | 7,283 | 18.5% | 12 of 12 |
| 2018 | 6,954 | 17.6% | 12 of 12 |
| 2019 | 6,958 | 17.7% | 12 of 12 |
| 2020 | 6,505 | 16.5% | 12 of 12 |
| 2021 | 6,488 | 16.5% | 12 of 12 |
| 2022 | 6,657 | 16.9% | 12 of 12 |
| 2023 | 5,895 | 15.0% | 12 of 12 |
| 2024 | 5,917 | 15.0% | 12 of 12 |
| 2025 | 5,609 | 14.2% | 12 of 12 |
| 2026 (provisional, partial year) | Not reported | Not reported | 0 of 7 |
* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.
Power prices and basis
Free accountNo verified ISO price node is linked to this plant, or its price history could not load.
Emissions
Free · EPA CAMPDNo EPA emissions units are linked to this plant.
Water use
Free · EIA-923 cooling, USGSNo EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.
Generators
Free · EIA-860M| Generator | Technology | Nameplate MW | Online since |
|---|---|---|---|
| FLS1 | Solar Photovoltaic | 4.5 | December 2015 |
Ownership and offtake
ProOwnership and offtake are part of Pro
Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Cypress Creek Renewables as the operator, which is not always the owner.
Modeled data
ProPro adds modeled values for this plant. Everything above stays free.
Modeled curtailment
A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.
Expected vs reported generation
Monthly modeled expected output and physical potential next to EIA-923 reported output.
300 analyst questions a month, plus MCP
Query TWE Chocowinity Solar, LLC and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.
Power plants near TWE Chocowinity Solar
More plants operated by Cypress Creek Renewables
Questions about TWE Chocowinity Solar
How much power does TWE Chocowinity Solar, LLC produce?
TWE Chocowinity Solar, LLC reported 5,609 MWh (5.61 GWh) of net generation in 2025, a 14.2% capacity factor on 4.5 MW of nameplate capacity.
Where is TWE Chocowinity Solar, LLC?
TWE Chocowinity Solar, LLC is in Beaufort County, North Carolina, at 35.5017, −77.1056. It is in the Duke Energy Carolinas balancing area (DUK).
Who operates TWE Chocowinity Solar, LLC?
EIA-860M for August 2026 lists Cypress Creek Renewables as the operator (EIA operator ID 61060). The operator is not always the owner.
When did TWE Chocowinity Solar, LLC start operating?
Its first generator began operating in December 2015, according to EIA-860M.
Sources
- EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
- EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
- Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)