SolarOperatingDUK

TWE New Bern Solar Project, LLC

Solar power plant in Craven County, North Carolina. 4 MW of nameplate capacity across 1 generator, operated by Cypress Creek Renewables.

Also known as TWE New Bern Solar Project · EIA plant 60191

Analyst: free account, 1 question a day.

Sweet Tea Solar, LLCGrove SolarAndrew SolarCraven County Wood Energy LPPlott Hound SolarTWE New Bern Solar Project2 km
Open in the map
5 plants within 4.3 km, from EIA coordinates.

Key facts

Capacity
4 MWNameplate
Generators
1 operatingEIA-860M, August 2026
Operating since
August 2016First generator online
Operator
Cypress Creek RenewablesEIA operator ID 61060
Grid
DUKBalancing authority DUK
Price nodes
None linkedNo verified ISO node
Location
Craven County, NC35.1543, −77.1343
EIA plant ID
60191EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power TWE New Bern Solar Project produces

Free · EIA-923

Net generation, 2025

6.01 GWh

6,014 MWh, final

Capacity factor, 2025

17.2%

2024: 18.1%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2017 to 2025

5.7–6.5

GWh a year. Low 2022, high 2017

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
2006Not reportedNot reported0 of 12
2007Not reportedNot reported0 of 12
2008Not reportedNot reported0 of 12
2009Not reportedNot reported0 of 12
2010Not reportedNot reported0 of 12
2011Not reportedNot reported0 of 12
2012Not reportedNot reported0 of 12
2013Not reportedNot reported0 of 12
2014Not reportedNot reported0 of 12
2015Not reportedNot reported0 of 12
20161,740Not reported5 of 12
20176,50618.6%12 of 12
20186,23717.8%12 of 12
20196,15417.6%12 of 12
20205,88816.8%12 of 12
20215,94717.0%12 of 12
20225,74516.4%12 of 12
20236,11417.4%12 of 12
20246,34418.1%12 of 12
20256,01417.2%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
FLS1Solar Photovoltaic4.0August 2016

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Cypress Creek Renewables as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Modeled curtailment

A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.

Modeled

Expected vs reported generation

Monthly modeled expected output and physical potential next to EIA-923 reported output.

Analyst and MCP

300 analyst questions a month, plus MCP

Query TWE New Bern Solar Project, LLC and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near TWE New Bern Solar Project

More plants operated by Cypress Creek Renewables

Questions about TWE New Bern Solar Project

How much power does TWE New Bern Solar Project, LLC produce?

TWE New Bern Solar Project, LLC reported 6,014 MWh (6.01 GWh) of net generation in 2025, a 17.2% capacity factor on 4 MW of nameplate capacity.

Where is TWE New Bern Solar Project, LLC?

TWE New Bern Solar Project, LLC is in Craven County, North Carolina, at 35.1543, −77.1343. It is in the Duke Energy Carolinas balancing area (DUK).

Who operates TWE New Bern Solar Project, LLC?

EIA-860M for August 2026 lists Cypress Creek Renewables as the operator (EIA operator ID 61060). The operator is not always the owner.

When did TWE New Bern Solar Project, LLC start operating?

Its first generator began operating in August 2016, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page