WindOperatingSPP

Brady Wind Energy Center

Wind power plant in Stark County, North Dakota. 150 MW of nameplate capacity across 1 generator, operated by Brady Wind, LLC.

Also known as Brady Wind I · EIA plant 60355

Analyst: free account, 1 question a day.

Sunflower Wind ProjectBrady25 km
Open in the map
2 plants within 57 km, from EIA coordinates.

Key facts

Capacity
150 MWNameplate
Generators
1 operatingEIA-860M, August 2026
Operating since
November 2016First generator online
Operator
Brady Wind, LLCEIA operator ID 60148
Grid
SPPBalancing authority SWPP
Price nodes
1 SPP nodeResource nodes with prices
Location
Stark County, ND46.6465, −102.7651
EIA plant ID
60355EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Brady produces

Free · EIA-923

Net generation, 2025

639 GWh

638,878 MWh, final

Capacity factor, 2025

48.6%

2024: 48.0%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2017 to 2025

615.5–695.1

GWh a year. Low 2023, high 2020

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
2006Not reportedNot reported0 of 12
2007Not reportedNot reported0 of 12
2008Not reportedNot reported0 of 12
2009Not reportedNot reported0 of 12
2010Not reportedNot reported0 of 12
2011Not reportedNot reported0 of 12
2012Not reportedNot reported0 of 12
2013Not reportedNot reported0 of 12
2014Not reportedNot reported0 of 12
2015Not reportedNot reported0 of 12
201694,870Not reported2 of 12
2017682,95152.0%12 of 12
2018628,59447.8%12 of 12
2019651,12349.6%12 of 12
2020695,08952.8%12 of 12
2021635,10248.3%12 of 12
2022675,78951.4%12 of 12
2023615,51346.8%12 of 12
2024632,29748.0%12 of 12
2025638,87848.6%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · SPP

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
BWEC1Onshore Wind Turbine150.0November 2016

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Brady Wind, LLC as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Modeled curtailment

A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.

Modeled

Expected vs reported generation

Monthly modeled expected output and physical potential next to EIA-923 reported output.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Brady Wind Energy Center and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Brady

Questions about Brady

How much power does Brady Wind Energy Center produce?

Brady Wind Energy Center reported 638,878 MWh (639 GWh) of net generation in 2025, a 48.6% capacity factor on 150 MW of nameplate capacity.

Where is Brady Wind Energy Center?

Brady Wind Energy Center is in Stark County, North Dakota, at 46.6465, −102.7651. It is in the Southwest Power Pool balancing area (SWPP).

Who operates Brady Wind Energy Center?

EIA-860M for August 2026 lists Brady Wind, LLC as the operator (EIA operator ID 60148). The operator is not always the owner.

When did Brady Wind Energy Center start operating?

Its first generator began operating in November 2016, according to EIA-860M.

Does InfraMap have power prices for Brady Wind Energy Center?

Yes. InfraMap has SPP day-ahead and real-time prices at 1 price node linked to Brady Wind Energy Center, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • SPP day-ahead and real-time prices; node and hub assignments as of 2026-10-05
  • Project names from the USGS U.S. Wind Turbine Database

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page