San Joaquin Solar

Solar power plant in Fresno County, California. 21.3 MW of nameplate capacity across 2 generators, operated by GASNA 6P, LLC.

Also known as EIA plant 60678

Analyst: free account, 1 question a day.

Stroud Solar StationVan der Hoek Solar Array/ DairyFresno SolarFresno Cogen PartnersCrystal Farms Local SolarOpen Sky Ranch IncSan Joaquin Solar5 km
Open in the map
6 plants within 13 km, from EIA coordinates.

Key facts

Capacity
21.3 MWNameplate
Generators
2 operatingEIA-860M, August 2026
Operating since
May 2018First generator online
Operator
GASNA 6P, LLCEIA operator ID 60399
Grid
CAISOBalancing authority CISO
Price nodes
1 CAISO nodeResource nodes with prices
Location
Fresno County, CA36.5272, −120.1479
EIA plant ID
60678EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power San Joaquin Solar produces

Free · EIA-923

Net generation, 2025

22.4 GWh

22,393 MWh, final

Capacity factor, 2025

12.0%

2024: 13.1%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2019 to 2025

22.4–41.1

GWh a year. Low 2025, high 2020

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
2006Not reportedNot reported0 of 12
2007Not reportedNot reported0 of 12
2008Not reportedNot reported0 of 12
2009Not reportedNot reported0 of 12
2010Not reportedNot reported0 of 12
2011Not reportedNot reported0 of 12
2012Not reportedNot reported0 of 12
2013Not reportedNot reported0 of 12
2014Not reportedNot reported0 of 12
2015Not reportedNot reported0 of 12
2016Not reportedNot reported0 of 12
2017Not reportedNot reported0 of 12
201811,317Not reported3 of 12
201938,908Not reported12 of 12
202041,06321.9%12 of 12
202128,27615.2%12 of 12
202231,37616.8%12 of 12
202337,17119.9%12 of 12
202424,54013.1%12 of 12
202522,39312.0%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · CAISO

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
SJ1ASolar Photovoltaic19.8May 2018
SJ1BSolar Photovoltaic1.5July 2019

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists GASNA 6P, LLC as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Modeled curtailment

A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.

Modeled

Expected vs reported generation

Monthly modeled expected output and physical potential next to EIA-923 reported output.

Analyst and MCP

300 analyst questions a month, plus MCP

Query San Joaquin Solar and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near San Joaquin Solar

Questions about San Joaquin Solar

How much power does San Joaquin Solar produce?

San Joaquin Solar reported 22,393 MWh (22.4 GWh) of net generation in 2025, a 12.0% capacity factor on 21.3 MW of nameplate capacity.

Where is San Joaquin Solar?

San Joaquin Solar is in Fresno County, California, at 36.5272, −120.1479. It is in the California Independent System Operator balancing area (CISO).

Who operates San Joaquin Solar?

EIA-860M for August 2026 lists GASNA 6P, LLC as the operator (EIA operator ID 60399). The operator is not always the owner.

When did San Joaquin Solar start operating?

Its first generator began operating in May 2018, according to EIA-860M.

Does InfraMap have power prices for San Joaquin Solar?

Yes. InfraMap has CAISO day-ahead and real-time prices at 1 price node linked to San Joaquin Solar, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • CAISO day-ahead and real-time prices; node and hub assignments as of 2026-10-05

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page