SolarOperatingISO-NE

Bird Machine Solar Farm

Solar power plant in Norfolk County, Massachusetts. 3.5 MW of nameplate capacity across 1 generator, operated by Bird Machine Solar Farm, LLC.

Also known as EIA plant 60854

Analyst: free account, 1 question a day.

Walpole Solar 2One Patriot1 CommercialDynamic - Walpole15 LincolnBird Machine Solar Farm2 km
Open in the map
6 plants within 5.2 km, from EIA coordinates.

Key facts

Capacity
3.5 MWNameplate
Generators
1 operatingEIA-860M, August 2026
Operating since
August 2017First generator online
Operator
Bird Machine Solar Farm, LLCEIA operator ID 60513
Grid
ISO-NEBalancing authority ISNE
Price nodes
1 ISONE nodeResource nodes with prices
Location
Norfolk County, MA42.1096, −71.2667
EIA plant ID
60854EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Bird Machine Solar Farm produces

Free · EIA-923

Net generation, 2025

5.93 GWh

5,925 MWh, final

Capacity factor, 2025

19.3%

2024: 19.2%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2018 to 2025

5.4–6.1

GWh a year. Low 2018, high 2022

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
2006Not reportedNot reported0 of 12
2007Not reportedNot reported0 of 12
2008Not reportedNot reported0 of 12
2009Not reportedNot reported0 of 12
2010Not reportedNot reported0 of 12
2011Not reportedNot reported0 of 12
2012Not reportedNot reported0 of 12
2013Not reportedNot reported0 of 12
2014Not reportedNot reported0 of 12
2015Not reportedNot reported0 of 12
2016Not reportedNot reported0 of 12
20171,804Not reported5 of 12
20185,446Not reported12 of 12
20195,74718.7%12 of 12
20205,85819.1%12 of 12
20215,73418.7%12 of 12
20226,14620.0%12 of 12
20235,88919.2%12 of 12
20245,90819.2%12 of 12
20255,92519.3%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · ISONE

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
BRDMASolar Photovoltaic3.5August 2017

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Bird Machine Solar Farm, LLC as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Modeled curtailment

A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.

Modeled

Expected vs reported generation

Monthly modeled expected output and physical potential next to EIA-923 reported output.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Bird Machine Solar Farm and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Bird Machine Solar Farm

Questions about Bird Machine Solar Farm

How much power does Bird Machine Solar Farm produce?

Bird Machine Solar Farm reported 5,925 MWh (5.93 GWh) of net generation in 2025, a 19.3% capacity factor on 3.5 MW of nameplate capacity.

Where is Bird Machine Solar Farm?

Bird Machine Solar Farm is in Norfolk County, Massachusetts, at 42.1096, −71.2667. It is in the ISO New England Inc. balancing area (ISNE).

Who operates Bird Machine Solar Farm?

EIA-860M for August 2026 lists Bird Machine Solar Farm, LLC as the operator (EIA operator ID 60513). The operator is not always the owner.

When did Bird Machine Solar Farm start operating?

Its first generator began operating in August 2017, according to EIA-860M.

Does InfraMap have power prices for Bird Machine Solar Farm?

Yes. InfraMap has ISONE day-ahead and real-time prices at 1 price node linked to Bird Machine Solar Farm, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • ISONE day-ahead and real-time prices; node and hub assignments as of 2026-10-05

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page