Key facts

Capacity
1.5 MWNameplate
Generators
1 operatingEIA-860M, August 2026
Operating since
January 2011First generator online
Operator
Merck - Upper Gwynedd Solar ArrayEIA operator ID 60812
Grid
PJMBalancing authority PJM
Price nodes
None linkedNo verified ISO node
Location
Montgomery County, PA40.2154, −75.2831
EIA plant ID
61198EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Merck - Upper Gwynedd Solar Array produces

Free · EIA-923

Net generation, 2025

1.59 GWh

1,585 MWh, final

Capacity factor, 2025

12.1%

2024: 12.2%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2016 to 2025

0.0–1.8

GWh a year. Low 2020, high 2023

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
2006Not reportedNot reported0 of 12
2007Not reportedNot reported0 of 12
2008Not reportedNot reported0 of 12
2009Not reportedNot reported0 of 12
2010Not reportedNot reported0 of 12
2011Not reportedNot reported0 of 12
2012Not reportedNot reported0 of 12
2013Not reportedNot reported0 of 12
2014Not reportedNot reported0 of 12
2015Not reportedNot reported0 of 12
20161,76013.4%12 of 12
20171,57912.0%12 of 12
20181,38910.6%12 of 12
20197745.9%12 of 12
202000.0%12 of 12
202100.0%12 of 12
20221,48311.3%12 of 12
20231,83414.0%12 of 12
20241,60212.2%12 of 12
20251,58512.1%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
SA-1Solar Photovoltaic1.5January 2011

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Merck - Upper Gwynedd Solar Array as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Modeled curtailment

A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.

Modeled

Expected vs reported generation

Monthly modeled expected output and physical potential next to EIA-923 reported output.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Merck - Upper Gwynedd Solar Array and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Merck - Upper Gwynedd Solar Array

Questions about Merck - Upper Gwynedd Solar Array

How much power does Merck - Upper Gwynedd Solar Array produce?

Merck - Upper Gwynedd Solar Array reported 1,585 MWh (1.59 GWh) of net generation in 2025, a 12.1% capacity factor on 1.5 MW of nameplate capacity.

Where is Merck - Upper Gwynedd Solar Array?

Merck - Upper Gwynedd Solar Array is in Montgomery County, Pennsylvania, at 40.2154, −75.2831. It is in the PJM Interconnection, LLC balancing area (PJM).

Who operates Merck - Upper Gwynedd Solar Array?

EIA-860M for August 2026 lists Merck - Upper Gwynedd Solar Array as the operator (EIA operator ID 60812). The operator is not always the owner.

When did Merck - Upper Gwynedd Solar Array start operating?

Its first generator began operating in January 2011, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page