Natural gasOperatingFPL

Lauderdale

Natural gas power plant in Broward County, Florida. 1,215.9 MW of nameplate capacity across 7 generators, operated by Florida Power & Light Co.

Also known as Lauderdale Power Plant · EIA plant 613

Analyst: free account, 1 question a day.

Port EvergladesPembroke Lakes MallCSL Gas RecoveryWynwood Energy StorageLauderdale10 km
Open in the map
6 plants within 30 km, from EIA coordinates.

Key facts

Capacity
1,215.9 MWNameplate
Generators
7 operatingEIA-860M, August 2026
Operating since
August 1970First generator online
Operator
Florida Power & Light CoEIA operator ID 6452
Grid
FPLBalancing authority FPL
Price nodes
None linkedNo verified ISO node
Location
Broward County, FL26.0686, −80.1984
EIA plant ID
613EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Lauderdale produces

Free · EIA-923

Net generation, 2025

263 GWh

262,871 MWh, final

Capacity factor, 2025

2.5%

2024: 2.3%

January to July 2026

152 GWh

Provisional

Range, 2015 to 2025

0.2–4.5

TWh a year. Low 2024, high 2015

Annual net generation, TWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
20006,547,773Not reported12 of 12
20016,164,232Not reported12 of 12
20026,471,055Not reported12 of 12
20035,575,611Not reported11 of 12
20045,165,810Not reported12 of 12
20055,423,100Not reported12 of 12
20065,898,224Not reported12 of 12
2007532,334Not reported1 of 12
2008Not reportedNot reported0 of 12
20095,077,013Not reported12 of 12
20104,472,05127.4%12 of 12
20115,094,30531.2%12 of 12
20124,406,82526.9%12 of 12
20134,764,35429.2%12 of 12
20144,559,51827.9%12 of 12
20154,519,96527.7%12 of 12
20163,058,880Not reported12 of 12
2017438,21727.0%1 of 12
2018616,56618.6%2 of 12
2019421,8944.0%12 of 12
2020373,7373.5%12 of 12
2021362,8033.4%12 of 12
2022314,9443.0%12 of 12
2023285,5312.7%12 of 12
2024244,5422.3%12 of 12
2025262,8712.5%12 of 12
2026 (provisional, partial year)152,0162.5%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

CO₂, 2025

193,637

US short tons. 2024: 187,557

SO₂, 2025

1

US short tons

NOx, 2025

54

US short tons

CO₂ per MWh, calculated

0.74 t

About 1,473 lb per MWh

5 of 5 EPA units reported CO₂ in 2025 (4GT1, 4GT2, 5GT1, 5GT2, GFL01, GFL02, GFL03, GFL04, and others), matched to EIA plant 613 through the EPA–EIA crosswalk. The per-MWh rate is EPA CO₂ divided by EIA-923 net generation. The two reporting boundaries can differ.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
3Natural Gas Fired Combustion Turbine34.2August 1970
5Natural Gas Fired Combustion Turbine34.2August 1970
6ANatural Gas Fired Combustion Turbine229.5December 2016
6BNatural Gas Fired Combustion Turbine229.5December 2016
6CNatural Gas Fired Combustion Turbine229.5December 2016
6DNatural Gas Fired Combustion Turbine229.5December 2016
6ENatural Gas Fired Combustion Turbine229.5December 2016

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Florida Power & Light Co as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Lauderdale and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Lauderdale

More plants operated by Florida Power & Light Co

Questions about Lauderdale

How much power does Lauderdale produce?

Lauderdale reported 262,871 MWh (263 GWh) of net generation in 2025, a 2.5% capacity factor on 1,215.9 MW of nameplate capacity. From January to July 2026 it reported 152 GWh, which is provisional.

Where is Lauderdale?

Lauderdale is in Broward County, Florida, at 26.0686, −80.1984. It is in the Florida Power & Light Company balancing area (FPL).

Who operates Lauderdale?

EIA-860M for August 2026 lists Florida Power & Light Co as the operator (EIA operator ID 6452). The operator is not always the owner.

When did Lauderdale start operating?

Its first generator began operating in August 1970, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page