Latitude Solar Center
Solar power plant in Hardeman County, Tennessee. 15 MW of nameplate capacity across 1 generator, operated by Arevon Energy, Inc..
Also known as EIA plant 61412
Analyst: free account, 1 question a day.
Key facts
- Capacity
- 15 MWNameplate
- Generators
- 1 operatingEIA-860M, August 2026
- Operating since
- December 2018First generator online
- Operator
- Arevon Energy, Inc.EIA operator ID 61230
- Grid
- TVABalancing authority TVA
- Price nodes
- None linkedNo verified ISO node
- Location
- Hardeman County, TN35.3064, −89.1675
- EIA plant ID
- 61412EIA plant page
Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.
How much power Latitude Solar Center produces
Free · EIA-923Net generation, 2025
25.7 GWh
25,724 MWh, final
Capacity factor, 2025
19.6%
2024: 18.5%
January to July 2026
Not reported
Provisional. 0 of 7 months reported
Range, 2019 to 2025
24.3–31.4
GWh a year. Low 2024, high 2019
| Year | Net generation, MWh | Capacity factor | Months reported |
|---|---|---|---|
| 2000 | Not reported | Not reported | 0 of 12 |
| 2001 | Not reported | Not reported | 0 of 12 |
| 2002 | Not reported | Not reported | 0 of 12 |
| 2003 | Not reported | Not reported | 0 of 12 |
| 2004 | Not reported | Not reported | 0 of 12 |
| 2005 | Not reported | Not reported | 0 of 12 |
| 2006 | Not reported | Not reported | 0 of 12 |
| 2007 | Not reported | Not reported | 0 of 12 |
| 2008 | Not reported | Not reported | 0 of 12 |
| 2009 | Not reported | Not reported | 0 of 12 |
| 2010 | Not reported | Not reported | 0 of 12 |
| 2011 | Not reported | Not reported | 0 of 12 |
| 2012 | Not reported | Not reported | 0 of 12 |
| 2013 | Not reported | Not reported | 0 of 12 |
| 2014 | Not reported | Not reported | 0 of 12 |
| 2015 | Not reported | Not reported | 0 of 12 |
| 2016 | Not reported | Not reported | 0 of 12 |
| 2017 | Not reported | Not reported | 0 of 12 |
| 2018 | 704 | Not reported | 1 of 12 |
| 2019 | 31,422 | 23.9% | 12 of 12 |
| 2020 | 30,219 | 22.9% | 12 of 12 |
| 2021 | 29,847 | 22.7% | 12 of 12 |
| 2022 | 29,331 | 22.3% | 12 of 12 |
| 2023 | 24,884 | 18.9% | 12 of 12 |
| 2024 | 24,313 | 18.5% | 12 of 12 |
| 2025 | 25,724 | 19.6% | 12 of 12 |
| 2026 (provisional, partial year) | Not reported | Not reported | 0 of 7 |
* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.
Power prices and basis
Free accountNo verified ISO price node is linked to this plant, or its price history could not load.
Emissions
Free · EPA CAMPDNo EPA emissions units are linked to this plant.
Water use
Free · EIA-923 cooling, USGSNo EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.
Generators
Free · EIA-860M| Generator | Technology | Nameplate MW | Online since |
|---|---|---|---|
| LATSC | Solar Photovoltaic | 15.0 | December 2018 |
Ownership and offtake
ProOwnership and offtake are part of Pro
Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Arevon Energy, Inc. as the operator, which is not always the owner.
Modeled data
ProPro adds modeled values for this plant. Everything above stays free.
Modeled curtailment
A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.
Expected vs reported generation
Monthly modeled expected output and physical potential next to EIA-923 reported output.
300 analyst questions a month, plus MCP
Query Latitude Solar Center and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.
Power plants near Latitude Solar Center
More plants operated by Arevon Energy, Inc.
Questions about Latitude Solar Center
How much power does Latitude Solar Center produce?
Latitude Solar Center reported 25,724 MWh (25.7 GWh) of net generation in 2025, a 19.6% capacity factor on 15 MW of nameplate capacity.
Where is Latitude Solar Center?
Latitude Solar Center is in Hardeman County, Tennessee, at 35.3064, −89.1675. It is in the Tennessee Valley Authority balancing area (TVA).
Who operates Latitude Solar Center?
EIA-860M for August 2026 lists Arevon Energy, Inc. as the operator (EIA operator ID 61230). The operator is not always the owner.
When did Latitude Solar Center start operating?
Its first generator began operating in December 2018, according to EIA-860M.
Sources
- EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
- EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page