NuclearOperatingTVA

Sequoyah

Nuclear power plant in Hamilton County, Tennessee. 2,441 MW of nameplate capacity across 2 generators, operated by Tennessee Valley Authority.

Also known as Sequoyah Nuclear Generating Station · EIA plant 6152

Analyst: free account, 1 question a day.

Volkswagen Solar SystemChickamaugaChattanooga Metropolitan Airport SolarSR SequatchieRaccoon MountainSequoyah20 km
Open in the map
6 plants within 33 km, from EIA coordinates.

Key facts

Capacity
2,441 MWNameplate
Generators
2 operatingEIA-860M, August 2026
Operating since
July 1981First generator online
Operator
Tennessee Valley AuthorityEIA operator ID 18642
Grid
TVABalancing authority TVA
Price nodes
None linkedNo verified ISO node
Location
Hamilton County, TN35.2267, −85.0917
EIA plant ID
6152EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Sequoyah produces

Free · EIA-923

Net generation, 2025

13.1 TWh

13,059,930 MWh, final

Capacity factor, 2025

61.1%

2024: 62.6%

January to July 2026

11.6 TWh

Provisional

Range, 2015 to 2025

13.1–19.2

TWh a year. Low 2025, high 2023

Annual net generation, TWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
200016,774,623Not reported12 of 12
200118,949,856Not reported12 of 12
200218,495,572Not reported12 of 12
200315,603,769Not reported12 of 12
200418,755,368Not reported12 of 12
200518,999,153Not reported12 of 12
200618,000,679Not reported12 of 12
200718,650,685Not reported12 of 12
200818,917,308Not reported12 of 12
200917,754,536Not reported12 of 12
201018,000,76484.2%12 of 12
201118,688,19387.4%12 of 12
201216,585,63077.4%12 of 12
201318,526,01186.6%12 of 12
201418,892,39188.4%12 of 12
201516,511,32277.2%12 of 12
201617,242,60880.4%12 of 12
201718,241,29985.3%12 of 12
201817,703,74982.8%12 of 12
201918,064,61984.5%12 of 12
202019,099,18989.1%12 of 12
202117,654,81282.6%12 of 12
202218,827,29988.0%12 of 12
202319,227,59689.9%12 of 12
202413,427,27762.6%12 of 12
202513,059,93061.1%12 of 12
2026 (provisional, partial year)11,570,87393.2%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

Withdrawal, 2024

492,571

million gallons

Consumption, 2024

15,455

million gallons

Source

Chickamauga Lake on Tennessee River

Surface, Fresh. Once-through

Watershed stress

Very low/none · 0.131

USGS SUI, HUC12 Blue Spring Creek-Chickamauga Lake

12 of 12 cooling months report withdrawal. SUI of the HUC12 containing the plant. Blank volumes are unreported, not zero.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
1Nuclear1,220.5July 1981
2Nuclear1,220.5June 1982

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Tennessee Valley Authority as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Sequoyah and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Sequoyah

More plants operated by Tennessee Valley Authority

Questions about Sequoyah

How much power does Sequoyah produce?

Sequoyah reported 13,059,930 MWh (13.1 TWh) of net generation in 2025, a 61.1% capacity factor on 2,441 MW of nameplate capacity. From January to July 2026 it reported 11.6 TWh, which is provisional.

Where is Sequoyah?

Sequoyah is in Hamilton County, Tennessee, at 35.2267, −85.0917. It is in the Tennessee Valley Authority balancing area (TVA).

Who operates Sequoyah?

EIA-860M for August 2026 lists Tennessee Valley Authority as the operator (EIA operator ID 18642). The operator is not always the owner.

When did Sequoyah start operating?

Its first generator began operating in July 1981, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EIA-923 cooling water 2024 and the USGS surface water supply and use index, Water years 2010-2020 (Oct 2009 to Sep 2020), mean of monthly values
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page