El Dorado Springs Solar Farm
Solar power plant in Cedar County, Missouri. 2.5 MW of nameplate capacity across 1 generator, operated by Missouri Jnt Muni.Pwr Elec. Ut. Comm..
Also known as EIA plant 61566
Analyst: free account, 1 question a day.
Key facts
- Capacity
- 2.5 MWNameplate
- Generators
- 1 operatingEIA-860M, August 2026
- Operating since
- June 2018First generator online
- Operator
- Missouri Jnt Muni.Pwr Elec. Ut. Comm.EIA operator ID 12670
- Grid
- SPPBalancing authority SWPP
- Price nodes
- None linkedNo verified ISO node
- Location
- Cedar County, MO37.8587, −94.0026
- EIA plant ID
- 61566EIA plant page
Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.
How much power El Dorado Springs Solar Farm produces
Free · EIA-923Net generation, 2025
3.81 GWh
3,808 MWh, final
Capacity factor, 2025
17.4%
2024: 19.0%
January to July 2026
Not reported
Provisional. 0 of 7 months reported
Range, 2019 to 2025
3.7–4.6
GWh a year. Low 2019, high 2022
| Year | Net generation, MWh | Capacity factor | Months reported |
|---|---|---|---|
| 2000 | Not reported | Not reported | 0 of 12 |
| 2001 | Not reported | Not reported | 0 of 12 |
| 2002 | Not reported | Not reported | 0 of 12 |
| 2003 | Not reported | Not reported | 0 of 12 |
| 2004 | Not reported | Not reported | 0 of 12 |
| 2005 | Not reported | Not reported | 0 of 12 |
| 2006 | Not reported | Not reported | 0 of 12 |
| 2007 | Not reported | Not reported | 0 of 12 |
| 2008 | Not reported | Not reported | 0 of 12 |
| 2009 | Not reported | Not reported | 0 of 12 |
| 2010 | Not reported | Not reported | 0 of 12 |
| 2011 | Not reported | Not reported | 0 of 12 |
| 2012 | Not reported | Not reported | 0 of 12 |
| 2013 | Not reported | Not reported | 0 of 12 |
| 2014 | Not reported | Not reported | 0 of 12 |
| 2015 | Not reported | Not reported | 0 of 12 |
| 2016 | Not reported | Not reported | 0 of 12 |
| 2017 | Not reported | Not reported | 0 of 12 |
| 2018 | 2,857 | Not reported | 7 of 12 |
| 2019 | 3,728 | 17.0% | 12 of 12 |
| 2020 | 4,375 | 19.9% | 12 of 12 |
| 2021 | 4,455 | 20.3% | 12 of 12 |
| 2022 | 4,551 | 20.8% | 12 of 12 |
| 2023 | 4,384 | 20.0% | 12 of 12 |
| 2024 | 4,181 | 19.0% | 12 of 12 |
| 2025 | 3,808 | 17.4% | 12 of 12 |
| 2026 (provisional, partial year) | Not reported | Not reported | 0 of 7 |
* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.
Power prices and basis
Free accountNo verified ISO price node is linked to this plant, or its price history could not load.
Emissions
Free · EPA CAMPDNo EPA emissions units are linked to this plant.
Water use
Free · EIA-923 cooling, USGSNo EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.
Generators
Free · EIA-860M| Generator | Technology | Nameplate MW | Online since |
|---|---|---|---|
| EDSF1 | Solar Photovoltaic | 2.5 | June 2018 |
Ownership and offtake
ProOwnership and offtake are part of Pro
Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Missouri Jnt Muni.Pwr Elec. Ut. Comm. as the operator, which is not always the owner.
Modeled data
ProPro adds modeled values for this plant. Everything above stays free.
Modeled curtailment
A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.
Expected vs reported generation
Monthly modeled expected output and physical potential next to EIA-923 reported output.
300 analyst questions a month, plus MCP
Query El Dorado Springs Solar Farm and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.
Power plants near El Dorado Springs Solar Farm
More plants operated by Missouri Jnt Muni.Pwr Elec. Ut. Comm.
Questions about El Dorado Springs Solar Farm
How much power does El Dorado Springs Solar Farm produce?
El Dorado Springs Solar Farm reported 3,808 MWh (3.81 GWh) of net generation in 2025, a 17.4% capacity factor on 2.5 MW of nameplate capacity.
Where is El Dorado Springs Solar Farm?
El Dorado Springs Solar Farm is in Cedar County, Missouri, at 37.8587, −94.0026. It is in the Southwest Power Pool balancing area (SWPP).
Who operates El Dorado Springs Solar Farm?
EIA-860M for August 2026 lists Missouri Jnt Muni.Pwr Elec. Ut. Comm. as the operator (EIA operator ID 12670). The operator is not always the owner.
When did El Dorado Springs Solar Farm start operating?
Its first generator began operating in June 2018, according to EIA-860M.
Sources
- EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
- EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page