SolarOperatingDUK

NC 102 Project LLC

Solar power plant in Cabarrus County, North Carolina. 74.8 MW of nameplate capacity across 1 generator, operated by NC 102 Project LLC.

Also known as NC 102 Project · NC 102 Project, LLC · EIA plant 61610

Analyst: free account, 1 question a day.

Howell Midland Farm, LLCSpeedway Solar NC, LLCViolet SolarConcord EnergyGRS CMSConcord FarmNC 102 Project10 km
Open in the map
6 plants within 23 km, from EIA coordinates.

Key facts

Capacity
74.8 MWNameplate
Generators
1 operatingEIA-860M, August 2026
Operating since
September 2018First generator online
Operator
NC 102 Project LLCEIA operator ID 61209
Grid
DUKBalancing authority DUK
Price nodes
None linkedNo verified ISO node
Location
Cabarrus County, NC35.2925, −80.4975
EIA plant ID
61610EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power NC 102 Project produces

Free · EIA-923

Net generation, 2025

140 GWh

139,935 MWh, final

Capacity factor, 2025

21.4%

2024: 21.4%

January to July 2026

92.6 GWh

Provisional

Range, 2019 to 2025

129.1–149.2

GWh a year. Low 2019, high 2022

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
2006Not reportedNot reported0 of 12
2007Not reportedNot reported0 of 12
2008Not reportedNot reported0 of 12
2009Not reportedNot reported0 of 12
2010Not reportedNot reported0 of 12
2011Not reportedNot reported0 of 12
2012Not reportedNot reported0 of 12
2013Not reportedNot reported0 of 12
2014Not reportedNot reported0 of 12
2015Not reportedNot reported0 of 12
2016Not reportedNot reported0 of 12
2017Not reportedNot reported0 of 12
201816,810Not reported4 of 12
2019129,09419.7%12 of 12
2020140,53421.4%12 of 12
2021142,41121.7%12 of 12
2022149,21122.8%12 of 12
2023143,95422.0%12 of 12
2024129,30021.4%11 of 12
2025139,93521.4%12 of 12
2026 (provisional, partial year)92,61424.3%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
NC102Solar Photovoltaic74.8September 2018

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists NC 102 Project LLC as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Modeled curtailment

A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.

Modeled

Expected vs reported generation

Monthly modeled expected output and physical potential next to EIA-923 reported output.

Analyst and MCP

300 analyst questions a month, plus MCP

Query NC 102 Project LLC and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near NC 102 Project

Questions about NC 102 Project

How much power does NC 102 Project LLC produce?

NC 102 Project LLC reported 139,935 MWh (140 GWh) of net generation in 2025, a 21.4% capacity factor on 74.8 MW of nameplate capacity. From January to July 2026 it reported 92.6 GWh, which is provisional.

Where is NC 102 Project LLC?

NC 102 Project LLC is in Cabarrus County, North Carolina, at 35.2925, −80.4975. It is in the Duke Energy Carolinas balancing area (DUK).

Who operates NC 102 Project LLC?

EIA-860M for August 2026 lists NC 102 Project LLC as the operator (EIA operator ID 61209). The operator is not always the owner.

When did NC 102 Project LLC start operating?

Its first generator began operating in September 2018, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)
  • Project names from the USGS U.S. Large-Scale Solar Photovoltaic Database

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page