NuclearOperatingERCOT

South Texas Project

Nuclear power plant in Matagorda County, Texas. 2,708.6 MW of nameplate capacity across 2 generators, operated by STP Nuclear Operating Co.

Also known as South Texas Project Electric Generating Station · EIA plant 6251

Analyst: free account, 1 question a day.

Regis PalaciosPeyton Creek Wind Farm LLCPeyton Creek Wind Farm IIHEB00292PavlovSouth Texas Project10 km
Open in the map
6 plants within 23 km, from EIA coordinates.

Key facts

Capacity
2,708.6 MWNameplate
Generators
2 operatingEIA-860M, August 2026
Operating since
August 1988First generator online
Operator
STP Nuclear Operating CoEIA operator ID 21535
Grid
ERCOTBalancing authority ERCO
Price nodes
2 ERCOT nodesResource nodes with prices
Location
Matagorda County, TX28.7950, −96.0481
EIA plant ID
6251EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power South Texas Project produces

Free · EIA-923

Net generation, 2025

21.8 TWh

21,782,126 MWh, final

Capacity factor, 2025

91.8%

2024: 79.5%

January to July 2026

11.9 TWh

Provisional

Range, 2015 to 2025

18.9–22.0

TWh a year. Low 2024, high 2019

Annual net generation, TWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
200019,098,939Not reported12 of 12
200119,840,598Not reported12 of 12
200219,049,602Not reported12 of 12
200315,688,541Not reported12 of 12
200421,371,967Not reported12 of 12
200519,789,293Not reported12 of 12
200621,368,269Not reported12 of 12
200722,109,283Not reported12 of 12
200821,492,749Not reported12 of 12
200921,356,148Not reported12 of 12
201021,126,78189.0%12 of 12
201120,365,89685.8%12 of 12
201218,544,09377.9%12 of 12
201317,827,85675.1%12 of 12
201420,651,66787.0%12 of 12
201519,400,55381.8%12 of 12
201621,694,30391.2%12 of 12
201721,581,47691.0%12 of 12
201820,687,63287.2%12 of 12
201921,993,29792.7%12 of 12
202021,958,757Not reported12 of 12
202120,855,00487.9%12 of 12
202221,919,88592.4%12 of 12
202321,787,14491.8%12 of 12
202418,926,46379.5%12 of 12
202521,782,12691.8%12 of 12
2026 (provisional, partial year)11,850,38586.0%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · ERCOT

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

Withdrawal, 2024

739,867

million gallons

Consumption, 2024

19,522

million gallons

Source

Colorado River

Surface, Fresh. Recirculating with cooling pond

Watershed stress

Moderate · 0.472

USGS SUI, HUC12 Mad Island Slough-Frontal Matagorda Bay

12 of 12 cooling months report withdrawal. SUI of the source river HUC12 within 3 km. Cooling-pond plants report water circulated through the pond as withdrawal, so withdrawal is far above consumption. Blank volumes are unreported, not zero.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
1Nuclear1,354.3August 1988
2Nuclear1,354.3June 1989

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists STP Nuclear Operating Co as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query South Texas Project and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near South Texas Project

Questions about South Texas Project

How much power does South Texas Project produce?

South Texas Project reported 21,782,126 MWh (21.8 TWh) of net generation in 2025, a 91.8% capacity factor on 2,708.6 MW of nameplate capacity. From January to July 2026 it reported 11.9 TWh, which is provisional.

Where is South Texas Project?

South Texas Project is in Matagorda County, Texas, at 28.7950, −96.0481. It is in the Electric Reliability Council of Texas, Inc. balancing area (ERCO).

Who operates South Texas Project?

EIA-860M for August 2026 lists STP Nuclear Operating Co as the operator (EIA operator ID 21535). The operator is not always the owner.

When did South Texas Project start operating?

Its first generator began operating in August 1988, according to EIA-860M.

Does InfraMap have power prices for South Texas Project?

Yes. InfraMap has ERCOT day-ahead and real-time prices at 2 price nodes linked to South Texas Project, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • ERCOT day-ahead and real-time prices; node and hub assignments as of 2026-10-05
  • EIA-923 cooling water 2024 and the USGS surface water supply and use index, Water years 2010-2020 (Oct 2009 to Sep 2020), mean of monthly values
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page