Delta Energy Park
Natural gas power plant in Eaton County, Michigan. 263.2 MW of nameplate capacity across 4 generators, operated by Lansing Board of Water and Light.
Also known as EIA plant 63259
Analyst: free account, 1 question a day.
Key facts
- Capacity
- 263.2 MWNameplate
- Generators
- 4 operatingEIA-860M, August 2026
- Operating since
- March 2022First generator online
- Operator
- Lansing Board of Water and LightEIA operator ID 56155
- Grid
- MISOBalancing authority MISO
- Price nodes
- 1 MISO nodeResource nodes with prices
- Location
- Eaton County, MI42.6906, −84.6578
- EIA plant ID
- 63259EIA plant page
Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.
How much power Delta Energy Park produces
Free · EIA-923Net generation, 2025
1.47 TWh
1,471,915 MWh, final
Capacity factor, 2025
63.8%
2024: 40.1%
January to July 2026
779 GWh
Provisional
Range, 2023 to 2025
0.9–1.5
TWh a year. Low 2024, high 2025
| Year | Net generation, MWh | Capacity factor | Months reported |
|---|---|---|---|
| 2000 | Not reported | Not reported | 0 of 12 |
| 2001 | Not reported | Not reported | 0 of 12 |
| 2002 | Not reported | Not reported | 0 of 12 |
| 2003 | Not reported | Not reported | 0 of 12 |
| 2004 | Not reported | Not reported | 0 of 12 |
| 2005 | Not reported | Not reported | 0 of 12 |
| 2006 | Not reported | Not reported | 0 of 12 |
| 2007 | Not reported | Not reported | 0 of 12 |
| 2008 | Not reported | Not reported | 0 of 12 |
| 2009 | Not reported | Not reported | 0 of 12 |
| 2010 | Not reported | Not reported | 0 of 12 |
| 2011 | Not reported | Not reported | 0 of 12 |
| 2012 | Not reported | Not reported | 0 of 12 |
| 2013 | Not reported | Not reported | 0 of 12 |
| 2014 | Not reported | Not reported | 0 of 12 |
| 2015 | Not reported | Not reported | 0 of 12 |
| 2016 | Not reported | Not reported | 0 of 12 |
| 2017 | Not reported | Not reported | 0 of 12 |
| 2018 | Not reported | Not reported | 0 of 12 |
| 2019 | Not reported | Not reported | 0 of 12 |
| 2020 | Not reported | Not reported | 0 of 12 |
| 2021 | Not reported | Not reported | 0 of 12 |
| 2022 | 524,564 | Not reported | 10 of 12 |
| 2023 | 931,634 | 40.4% | 12 of 12 |
| 2024 | 927,163 | 40.1% | 12 of 12 |
| 2025 | 1,471,915 | 63.8% | 12 of 12 |
| 2026 (provisional, partial year) | 779,261 | 58.2% | 7 of 7 |
* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.
Power prices and basis
Free account · MISOEmissions
Free · EPA CAMPDCO₂, 2025
671,932
US short tons. 2024: 439,336
SO₂, 2025
3
US short tons
NOx, 2025
84
US short tons
CO₂ per MWh, calculated
0.46 t
About 913 lb per MWh
3 of 3 EPA units reported CO₂ in 2025 (DEPC2, DEPC3, DEPS1), matched to EIA plant 63259 through the EPA–EIA crosswalk. The per-MWh rate is EPA CO₂ divided by EIA-923 net generation. The two reporting boundaries can differ.
Water use
Free · EIA-923 cooling, USGSNo EIA cooling-water record for this plant in 2024.
Generators
Free · EIA-860M| Generator | Technology | Nameplate MW | Online since |
|---|---|---|---|
| DEPC2 | Natural Gas Fired Combined Cycle | 58.0 | March 2022 |
| DEPC3 | Natural Gas Fired Combined Cycle | 58.0 | March 2022 |
| DEPS1 | Natural Gas Fired Combustion Turbine | 58.0 | March 2022 |
| DEPST | Natural Gas Fired Combined Cycle | 89.2 | March 2022 |
Ownership and offtake
ProOwnership and offtake are part of Pro
Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Lansing Board of Water and Light as the operator, which is not always the owner.
Modeled data
ProPro adds modeled values for this plant. Everything above stays free.
Generation potential vs reported
Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.
300 analyst questions a month, plus MCP
Query Delta Energy Park and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.
Power plants near Delta Energy Park
More plants operated by Lansing Board of Water and Light
Questions about Delta Energy Park
How much power does Delta Energy Park produce?
Delta Energy Park reported 1,471,915 MWh (1.47 TWh) of net generation in 2025, a 63.8% capacity factor on 263.2 MW of nameplate capacity. From January to July 2026 it reported 779 GWh, which is provisional.
Where is Delta Energy Park?
Delta Energy Park is in Eaton County, Michigan, at 42.6906, −84.6578. It is in the Midcontinent Independent Transmission System Operator, Inc.. balancing area (MISO).
Who operates Delta Energy Park?
EIA-860M for August 2026 lists Lansing Board of Water and Light as the operator (EIA operator ID 56155). The operator is not always the owner.
When did Delta Energy Park start operating?
Its first generator began operating in March 2022, according to EIA-860M.
Does InfraMap have power prices for Delta Energy Park?
Yes. InfraMap has MISO day-ahead and real-time prices at 1 price node linked to Delta Energy Park, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.
Sources
- EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
- EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
- EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
- MISO day-ahead and real-time prices; node and hub assignments as of 2026-10-05
Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page