SolarOperatingCAISO

SCV Water - Gladbach Water Treatment Plant Phases I and II

Solar power plant in Los Angeles County, California. 4.5 MW of nameplate capacity across 1 generator, operated by SCV Water.

Also known as SCV Water Phase II · Castaic Lake Phase II · EIA plant 63385

Analyst: free account, 1 question a day.

Berry Placerita CogenPlacerita ESSSunshine Gas ProducersSan Francisquito 2Foothill FeederFoothillSCV Water - Gladbach…5 km
Open in the map
6 plants within 13 km, from EIA coordinates.

Key facts

Capacity
4.5 MWNameplate
Generators
1 operatingEIA-860M, August 2026
Operating since
December 2014First generator online
Operator
SCV WaterEIA operator ID 66983
Grid
CAISOBalancing authority CISO
Price nodes
None linkedNo verified ISO node
Location
Los Angeles County, CA34.4333, −118.5108
EIA plant ID
63385EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power SCV Water - Gladbach Water Treatment Plant Phases I and II produces

Free · EIA-923

Net generation, 2025

708 MWh

708 MWh, final

Capacity factor, 2025

1.8%

2024: Not reported

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2019 to 2025

0.7–7.9

GWh a year. Low 2025, high 2021

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
2006Not reportedNot reported0 of 12
2007Not reportedNot reported0 of 12
2008Not reportedNot reported0 of 12
2009Not reportedNot reported0 of 12
2010Not reportedNot reported0 of 12
2011Not reportedNot reported0 of 12
2012Not reportedNot reported0 of 12
2013Not reportedNot reported0 of 12
2014Not reportedNot reported0 of 12
2015Not reportedNot reported0 of 12
2016Not reportedNot reported0 of 12
2017Not reportedNot reported0 of 12
2018Not reportedNot reported0 of 12
20196,37020.8%12 of 12
20206,43120.9%12 of 12
20217,92825.9%12 of 12
20222,7649.0%12 of 12
20237,77625.4%12 of 12
20245,046Not reported12 of 12
20257081.8%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
CA135Solar Photovoltaic4.5December 2014

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists SCV Water as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Modeled curtailment

A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.

Modeled

Expected vs reported generation

Monthly modeled expected output and physical potential next to EIA-923 reported output.

Analyst and MCP

300 analyst questions a month, plus MCP

Query SCV Water - Gladbach Water Treatment Plant Phases I and II and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near SCV Water - Gladbach Water Treatment Plant Phases I and II

Questions about SCV Water - Gladbach Water Treatment Plant Phases I and II

How much power does SCV Water - Gladbach Water Treatment Plant Phases I and II produce?

SCV Water - Gladbach Water Treatment Plant Phases I and II reported 708 MWh (708 MWh) of net generation in 2025, a 1.8% capacity factor on 4.5 MW of nameplate capacity.

Where is SCV Water - Gladbach Water Treatment Plant Phases I and II?

SCV Water - Gladbach Water Treatment Plant Phases I and II is in Los Angeles County, California, at 34.4333, −118.5108. It is in the California Independent System Operator balancing area (CISO).

Who operates SCV Water - Gladbach Water Treatment Plant Phases I and II?

EIA-860M for August 2026 lists SCV Water as the operator (EIA operator ID 66983). The operator is not always the owner.

When did SCV Water - Gladbach Water Treatment Plant Phases I and II start operating?

Its first generator began operating in December 2014, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)
  • Project names from the USGS U.S. Large-Scale Solar Photovoltaic Database

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page