Key facts
- Capacity
- 999 MWNameplate
- Generators
- 1 operatingEIA-860M, August 2026
- Operating since
- April 2022First generator online
- Operator
- Southwestern Electric Power CoEIA operator ID 17698
- Grid
- SPPBalancing authority SWPP
- Price nodes
- 3 SPP nodesResource nodes with prices
- Location
- Custer County, OK35.7110, −98.8347
- EIA plant ID
- 63479EIA plant page
Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.
How much power Traverse Wind Project produces
Free · EIA-923Net generation, 2025
3.10 TWh
3,104,927 MWh, final
Capacity factor, 2025
35.5%
2024: 37.0%
January to July 2026
2.22 TWh
Provisional
Range, 2023 to 2025
3.1–3.2
TWh a year. Low 2025, high 2024
| Year | Net generation, MWh | Capacity factor | Months reported |
|---|---|---|---|
| 2000 | Not reported | Not reported | 0 of 12 |
| 2001 | Not reported | Not reported | 0 of 12 |
| 2002 | Not reported | Not reported | 0 of 12 |
| 2003 | Not reported | Not reported | 0 of 12 |
| 2004 | Not reported | Not reported | 0 of 12 |
| 2005 | Not reported | Not reported | 0 of 12 |
| 2006 | Not reported | Not reported | 0 of 12 |
| 2007 | Not reported | Not reported | 0 of 12 |
| 2008 | Not reported | Not reported | 0 of 12 |
| 2009 | Not reported | Not reported | 0 of 12 |
| 2010 | Not reported | Not reported | 0 of 12 |
| 2011 | Not reported | Not reported | 0 of 12 |
| 2012 | Not reported | Not reported | 0 of 12 |
| 2013 | Not reported | Not reported | 0 of 12 |
| 2014 | Not reported | Not reported | 0 of 12 |
| 2015 | Not reported | Not reported | 0 of 12 |
| 2016 | Not reported | Not reported | 0 of 12 |
| 2017 | Not reported | Not reported | 0 of 12 |
| 2018 | Not reported | Not reported | 0 of 12 |
| 2019 | Not reported | Not reported | 0 of 12 |
| 2020 | Not reported | Not reported | 0 of 12 |
| 2021 | Not reported | Not reported | 0 of 12 |
| 2022 | 2,283,846 | Not reported | 9 of 12 |
| 2023 | 3,211,975 | 36.7% | 12 of 12 |
| 2024 | 3,246,147 | 37.0% | 12 of 12 |
| 2025 | 3,104,927 | 35.5% | 12 of 12 |
| 2026 (provisional, partial year) | 2,219,331 | 43.7% | 7 of 7 |
* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.
Power prices and basis
Free account · SPPEmissions
Free · EPA CAMPDNo EPA emissions units are linked to this plant.
Water use
Free · EIA-923 cooling, USGSNo EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.
Generators
Free · EIA-860M| Generator | Technology | Nameplate MW | Online since |
|---|---|---|---|
| GEN1 | Onshore Wind Turbine | 999.0 | April 2022 |
Ownership and offtake
ProOwnership and offtake are part of Pro
Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Southwestern Electric Power Co as the operator, which is not always the owner.
Modeled data
ProPro adds modeled values for this plant. Everything above stays free.
Modeled curtailment
A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.
Expected vs reported generation
Monthly modeled expected output and physical potential next to EIA-923 reported output.
300 analyst questions a month, plus MCP
Query Traverse Wind Project, LLC and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.
Power plants near Traverse Wind Project
More plants operated by Southwestern Electric Power Co
Questions about Traverse Wind Project
How much power does Traverse Wind Project, LLC produce?
Traverse Wind Project, LLC reported 3,104,927 MWh (3.10 TWh) of net generation in 2025, a 35.5% capacity factor on 999 MW of nameplate capacity. From January to July 2026 it reported 2.22 TWh, which is provisional.
Where is Traverse Wind Project, LLC?
Traverse Wind Project, LLC is in Custer County, Oklahoma, at 35.7110, −98.8347. It is in the Southwest Power Pool balancing area (SWPP).
Who operates Traverse Wind Project, LLC?
EIA-860M for August 2026 lists Southwestern Electric Power Co as the operator (EIA operator ID 17698). The operator is not always the owner.
When did Traverse Wind Project, LLC start operating?
Its first generator began operating in April 2022, according to EIA-860M.
Does InfraMap have power prices for Traverse Wind Project, LLC?
Yes. InfraMap has SPP day-ahead and real-time prices at 3 price nodes linked to Traverse Wind Project, LLC, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.
Sources
- EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
- EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
- SPP day-ahead and real-time prices; node and hub assignments as of 2026-10-05
- Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)
- Project names from the USGS U.S. Wind Turbine Database
Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page