Natural gasOperatingMISO

Hutchinson Plant #2

Natural gas power plant in McLeod County, Minnesota. 90.5 MW of nameplate capacity across 3 generators, operated by Hutchinson Utilities Comm.

Also known as EIA plant 6358

Analyst: free account, 1 question a day.

Hutchinson Plant #1Spruce Ridge Gas RecoveryGlencoeMeeker Community Solar One LLC CSGFastSun 1 CSGHutchinson Plant #210 km
Open in the map
6 plants within 21 km, from EIA coordinates.

Key facts

Capacity
90.5 MWNameplate
Generators
3 operatingEIA-860M, August 2026
Operating since
November 1994First generator online
Operator
Hutchinson Utilities CommEIA operator ID 9130
Grid
MISOBalancing authority MISO
Price nodes
1 MISO nodeResource nodes with prices
Location
McLeod County, MN44.8889, −94.3494
EIA plant ID
6358EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Hutchinson Plant #2 produces

Free · EIA-923

Net generation, 2025

28.2 GWh

28,186 MWh, final

Capacity factor, 2025

3.6%

2024: 0.2%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2015 to 2025

1.4–28.2

GWh a year. Low 2024, high 2025

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000104,219Not reported12 of 12
200139,807Not reported12 of 12
200236,675Not reported12 of 12
200321,645Not reported12 of 12
200411,458Not reported12 of 12
200521,512Not reported12 of 12
200619,078Not reported12 of 12
200725,082Not reported12 of 12
200816,512Not reported12 of 12
20092,465Not reported12 of 12
20107,6251.0%12 of 12
20119,7491.2%12 of 12
201219,4782.5%12 of 12
201316,036Not reported12 of 12
201413,3361.7%12 of 12
20159,5561.2%12 of 12
201619,8802.5%12 of 12
201720,0922.5%12 of 12
201823,0882.9%12 of 12
201915,5682.0%12 of 12
20209,8761.2%12 of 12
202113,9041.8%12 of 12
202215,0691.9%12 of 12
202324,9923.2%12 of 12
20241,4180.2%12 of 12
202528,1863.6%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · MISO

Emissions

Free · EPA CAMPD

CO₂, 2025

19,013

US short tons. 2024: 960

SO₂, 2025

0

US short tons

NOx, 2025

16

US short tons

CO₂ per MWh, calculated

0.67 t

About 1,349 lb per MWh

1 of 1 EPA units reported CO₂ in 2025 (1), matched to EIA plant 6358 through the EPA–EIA crosswalk. The per-MWh rate is EPA CO₂ divided by EIA-923 net generation. The two reporting boundaries can differ.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
2Natural Gas Fired Combined Cycle54.0November 1994
3Natural Gas Fired Combined Cycle11.5November 1994
9Natural Gas Fired Combustion Turbine25.0May 2001

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Hutchinson Utilities Comm as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Hutchinson Plant #2 and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Hutchinson Plant #2

More plants operated by Hutchinson Utilities Comm

Questions about Hutchinson Plant #2

How much power does Hutchinson Plant #2 produce?

Hutchinson Plant #2 reported 28,186 MWh (28.2 GWh) of net generation in 2025, a 3.6% capacity factor on 90.5 MW of nameplate capacity.

Where is Hutchinson Plant #2?

Hutchinson Plant #2 is in McLeod County, Minnesota, at 44.8889, −94.3494. It is in the Midcontinent Independent Transmission System Operator, Inc.. balancing area (MISO).

Who operates Hutchinson Plant #2?

EIA-860M for August 2026 lists Hutchinson Utilities Comm as the operator (EIA operator ID 9130). The operator is not always the owner.

When did Hutchinson Plant #2 start operating?

Its first generator began operating in November 1994, according to EIA-860M.

Does InfraMap have power prices for Hutchinson Plant #2?

Yes. InfraMap has MISO day-ahead and real-time prices at 1 price node linked to Hutchinson Plant #2, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
  • MISO day-ahead and real-time prices; node and hub assignments as of 2026-10-05

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page