Key facts
- Capacity
- 2.8 MWNameplate
- Generators
- 1 operatingEIA-860M, August 2026
- Operating since
- November 2023First generator online
- Operator
- Long Beach Trigen, LLCEIA operator ID 63658
- Grid
- CAISOBalancing authority CISO
- Price nodes
- 1 CAISO nodeResource nodes with prices
- Location
- Los Angeles County, CA33.7809, −118.2224
- EIA plant ID
- 64005EIA plant page
Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.
How much power Toyota Long Beach Trigen produces
Free · EIA-923Net generation, 2025
13.4 GWh
13,357 MWh, final
Capacity factor, 2025
54.5%
2024: 68.3%
January to July 2026
Not reported
Provisional. 0 of 7 months reported
Range, 2023 to 2025
5.1–16.8
GWh a year. Low 2023, high 2024
| Year | Net generation, MWh | Capacity factor | Months reported |
|---|---|---|---|
| 2000 | Not reported | Not reported | 0 of 12 |
| 2001 | Not reported | Not reported | 0 of 12 |
| 2002 | Not reported | Not reported | 0 of 12 |
| 2003 | Not reported | Not reported | 0 of 12 |
| 2004 | Not reported | Not reported | 0 of 12 |
| 2005 | Not reported | Not reported | 0 of 12 |
| 2006 | Not reported | Not reported | 0 of 12 |
| 2007 | Not reported | Not reported | 0 of 12 |
| 2008 | Not reported | Not reported | 0 of 12 |
| 2009 | Not reported | Not reported | 0 of 12 |
| 2010 | Not reported | Not reported | 0 of 12 |
| 2011 | Not reported | Not reported | 0 of 12 |
| 2012 | Not reported | Not reported | 0 of 12 |
| 2013 | Not reported | Not reported | 0 of 12 |
| 2014 | Not reported | Not reported | 0 of 12 |
| 2015 | Not reported | Not reported | 0 of 12 |
| 2016 | Not reported | Not reported | 0 of 12 |
| 2017 | Not reported | Not reported | 0 of 12 |
| 2018 | Not reported | Not reported | 0 of 12 |
| 2019 | Not reported | Not reported | 0 of 12 |
| 2020 | Not reported | Not reported | 0 of 12 |
| 2021 | Not reported | Not reported | 0 of 12 |
| 2022 | Not reported | Not reported | 0 of 12 |
| 2023 | 5,066 | Not reported | 12 of 12 |
| 2024 | 16,792 | 68.3% | 12 of 12 |
| 2025 | 13,357 | 54.5% | 12 of 12 |
| 2026 (provisional, partial year) | Not reported | Not reported | 0 of 7 |
* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.
Power prices and basis
Free account · CAISOEmissions
Free · EPA CAMPDNo EPA emissions units are linked to this plant.
Water use
Free · EIA-923 cooling, USGSNo EIA cooling-water record for this plant in 2024.
Generators
Free · EIA-860M| Generator | Technology | Nameplate MW | Online since |
|---|---|---|---|
| MMR-1 | Other Waste Biomass | 2.8 | November 2023 |
Ownership and offtake
ProOwnership and offtake are part of Pro
Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Long Beach Trigen, LLC as the operator, which is not always the owner.
Modeled data
ProPro adds modeled values for this plant. Everything above stays free.
Generation potential vs reported
Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.
300 analyst questions a month, plus MCP
Query Toyota Long Beach Trigen and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.
Power plants near Toyota Long Beach Trigen
Questions about Toyota Long Beach Trigen
How much power does Toyota Long Beach Trigen produce?
Toyota Long Beach Trigen reported 13,357 MWh (13.4 GWh) of net generation in 2025, a 54.5% capacity factor on 2.8 MW of nameplate capacity.
Where is Toyota Long Beach Trigen?
Toyota Long Beach Trigen is in Los Angeles County, California, at 33.7809, −118.2224. It is in the California Independent System Operator balancing area (CISO).
Who operates Toyota Long Beach Trigen?
EIA-860M for August 2026 lists Long Beach Trigen, LLC as the operator (EIA operator ID 63658). The operator is not always the owner.
When did Toyota Long Beach Trigen start operating?
Its first generator began operating in November 2023, according to EIA-860M.
Does InfraMap have power prices for Toyota Long Beach Trigen?
Yes. InfraMap has CAISO day-ahead and real-time prices at 1 price node linked to Toyota Long Beach Trigen, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.
Sources
- EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
- EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
- CAISO day-ahead and real-time prices; node and hub assignments as of 2026-10-05
Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page