SolarOperatingMISO

Olney Solar II CSG

Solar power plant in Richland County, Illinois. 2 MW of nameplate capacity across 1 generator, operated by Olney Solar II, LLC.

Also known as Olney Solar II (CSG) · EIA plant 64043

Analyst: free account, 1 question a day.

NewtonNewton Solar BESS LLCIMEA FloraSV CSG Aldridge A, LLCOlney Solar II CSG20 km
Open in the map
6 plants within 33 km, from EIA coordinates.

Key facts

Capacity
2 MWNameplate
Generators
1 operatingEIA-860M, August 2026
Operating since
June 2021First generator online
Operator
Olney Solar II, LLCEIA operator ID 63683
Grid
MISOBalancing authority MISO
Price nodes
None linkedNo verified ISO node
Location
Richland County, IL38.7216, −88.1268
EIA plant ID
64043EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Olney Solar II CSG produces

Free · EIA-923

Net generation, 2025

4.40 GWh

4,398 MWh, final

Capacity factor, 2025

25.1%

2024: 25.2%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2022 to 2025

4.4–4.5

GWh a year. Low 2025, high 2023

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
2006Not reportedNot reported0 of 12
2007Not reportedNot reported0 of 12
2008Not reportedNot reported0 of 12
2009Not reportedNot reported0 of 12
2010Not reportedNot reported0 of 12
2011Not reportedNot reported0 of 12
2012Not reportedNot reported0 of 12
2013Not reportedNot reported0 of 12
2014Not reportedNot reported0 of 12
2015Not reportedNot reported0 of 12
2016Not reportedNot reported0 of 12
2017Not reportedNot reported0 of 12
2018Not reportedNot reported0 of 12
2019Not reportedNot reported0 of 12
2020Not reportedNot reported0 of 12
20211,641Not reported7 of 12
20224,45925.5%12 of 12
20234,48225.6%12 of 12
20244,42025.2%12 of 12
20254,39825.1%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
6778Solar Photovoltaic2.0June 2021

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Olney Solar II, LLC as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Modeled curtailment

A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.

Modeled

Expected vs reported generation

Monthly modeled expected output and physical potential next to EIA-923 reported output.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Olney Solar II CSG and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Olney Solar II CSG

Questions about Olney Solar II CSG

How much power does Olney Solar II CSG produce?

Olney Solar II CSG reported 4,398 MWh (4.40 GWh) of net generation in 2025, a 25.1% capacity factor on 2 MW of nameplate capacity.

Where is Olney Solar II CSG?

Olney Solar II CSG is in Richland County, Illinois, at 38.7216, −88.1268. It is in the Midcontinent Independent Transmission System Operator, Inc.. balancing area (MISO).

Who operates Olney Solar II CSG?

EIA-860M for August 2026 lists Olney Solar II, LLC as the operator (EIA operator ID 63683). The operator is not always the owner.

When did Olney Solar II CSG start operating?

Its first generator began operating in June 2021, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • Project names from the USGS U.S. Large-Scale Solar Photovoltaic Database

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page