Camp Ripley Solar

Solar power plant in Morrison County, Minnesota. 10.9 MW of nameplate capacity across 1 generator, operated by Camp Riley Solar Facility.

Also known as EIA plant 64072

Analyst: free account, 1 question a day.

Little Falls (MN)SylvanBlanchardPillagerBrainerd Waste Water PlantCamp Ripley Solar10 km
Open in the map
6 plants within 29 km, from EIA coordinates.

Key facts

Capacity
10.9 MWNameplate
Generators
1 operatingEIA-860M, August 2026
Operating since
November 2016First generator online
Operator
Camp Riley Solar FacilityEIA operator ID 63704
Grid
MISOBalancing authority MISO
Price nodes
None linkedNo verified ISO node
Location
Morrison County, MN46.0910, −94.3400
EIA plant ID
64072EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Camp Ripley Solar produces

Free · EIA-923

Net generation, 2025

14.2 GWh

14,223 MWh, final

Capacity factor, 2025

14.9%

2024: 15.7%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2020 to 2025

14.2–17.2

GWh a year. Low 2025, high 2021

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
2006Not reportedNot reported0 of 12
2007Not reportedNot reported0 of 12
2008Not reportedNot reported0 of 12
2009Not reportedNot reported0 of 12
2010Not reportedNot reported0 of 12
2011Not reportedNot reported0 of 12
2012Not reportedNot reported0 of 12
2013Not reportedNot reported0 of 12
2014Not reportedNot reported0 of 12
2015Not reportedNot reported0 of 12
2016Not reportedNot reported0 of 12
2017Not reportedNot reported0 of 12
2018Not reportedNot reported0 of 12
2019Not reportedNot reported0 of 12
202016,16516.9%12 of 12
202117,20018.0%12 of 12
202216,11216.9%12 of 12
202315,79216.5%12 of 12
202415,04515.7%12 of 12
202514,22314.9%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
CR1Solar Photovoltaic10.9November 2016

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Camp Riley Solar Facility as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Modeled curtailment

A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.

Modeled

Expected vs reported generation

Monthly modeled expected output and physical potential next to EIA-923 reported output.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Camp Ripley Solar and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Camp Ripley Solar

Questions about Camp Ripley Solar

How much power does Camp Ripley Solar produce?

Camp Ripley Solar reported 14,223 MWh (14.2 GWh) of net generation in 2025, a 14.9% capacity factor on 10.9 MW of nameplate capacity.

Where is Camp Ripley Solar?

Camp Ripley Solar is in Morrison County, Minnesota, at 46.0910, −94.3400. It is in the Midcontinent Independent Transmission System Operator, Inc.. balancing area (MISO).

Who operates Camp Ripley Solar?

EIA-860M for August 2026 lists Camp Riley Solar Facility as the operator (EIA operator ID 63704). The operator is not always the owner.

When did Camp Ripley Solar start operating?

Its first generator began operating in November 2016, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page