HydroOperatingERCOT

Whitney

Hydro power plant in Bosque County, Texas. 41.8 MW of nameplate capacity across 2 generators, operated by USACE-Fort Worth District.

Also known as Lake Whitney Power Plant · EIA plant 6414

Analyst: free account, 1 question a day.

BT Hickerson Solar, LLCDileo SolarMarkum Solar FarmTPE Whitney Solar, LLCWhitney10 km
Open in the map
5 plants within 20 km, from EIA coordinates.

Key facts

Capacity
41.8 MWNameplate
Generators
2 operatingEIA-860M, August 2026
Operating since
June 1953First generator online
Operator
USACE-Fort Worth DistrictEIA operator ID 19449
Grid
ERCOTBalancing authority ERCO
Price nodes
1 ERCOT nodeResource nodes with prices
Location
Bosque County, TX31.8694, −97.3667
EIA plant ID
6414EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Whitney produces

Free · EIA-923

Net generation, 2025

66.9 GWh

66,931 MWh, final

Capacity factor, 2025

18.3%

2024: 18.9%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2015 to 2025

0.0–140.3

GWh a year. Low 2019, high 2016

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
200011,437Not reported12 of 12
2001Not reportedNot reported0 of 12
200235,334Not reported12 of 12
200311,702Not reported12 of 12
200461,206Not reported12 of 12
200553,119Not reported12 of 12
200614,616Not reported12 of 12
2007118,858Not reported12 of 12
200835,193Not reported12 of 12
200917,035Not reported12 of 12
201088,15233.5%12 of 12
201110,4824.0%12 of 12
201221,7248.2%12 of 12
20132,8011.1%12 of 12
20143,113Not reported12 of 12
201577,378Not reported12 of 12
2016140,27738.2%12 of 12
201732,4268.9%12 of 12
201871,13319.4%12 of 12
201900.0%12 of 12
202051,79714.1%12 of 12
202178,48021.4%12 of 12
20225,9541.6%12 of 12
20232,4670.7%12 of 12
202469,35718.9%12 of 12
202566,93118.3%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · ERCOT

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
1Conventional Hydroelectric20.9June 1953
2Conventional Hydroelectric20.9June 1953

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists USACE-Fort Worth District as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Whitney and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Whitney

More plants operated by USACE-Fort Worth District

Questions about Whitney

How much power does Whitney produce?

Whitney reported 66,931 MWh (66.9 GWh) of net generation in 2025, a 18.3% capacity factor on 41.8 MW of nameplate capacity.

Where is Whitney?

Whitney is in Bosque County, Texas, at 31.8694, −97.3667. It is in the Electric Reliability Council of Texas, Inc. balancing area (ERCO).

Who operates Whitney?

EIA-860M for August 2026 lists USACE-Fort Worth District as the operator (EIA operator ID 19449). The operator is not always the owner.

When did Whitney start operating?

Its first generator began operating in June 1953, according to EIA-860M.

Does InfraMap have power prices for Whitney?

Yes. InfraMap has ERCOT day-ahead and real-time prices at 1 price node linked to Whitney, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • ERCOT day-ahead and real-time prices; node and hub assignments as of 2026-10-05
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page