Azure Sky Wind Project, LLC Hybrid
Wind and battery storage project in Throckmorton County, Texas. 470.2 MW of nameplate capacity across 2 generators, operated by Azure Sky Wind Project, LLC.
Also known as Azure Sky Wind Project · EIA plant 64164
This project groups Azure Sky Wind Project, LLC Hybrid (EIA 64164). EIA reports them as separate plants.
Analyst: free account, 1 question a day.
Key facts
- Capacity
- 470.2 MWWind 350.2 · Battery storage 120.0
- Generators
- 2 operatingEIA-860M, August 2026
- Operating since
- December 2023First generator online
- Operator
- Azure Sky Wind Project, LLCEIA operator ID 63784
- Grid
- ERCOTBalancing authority ERCO
- Price nodes
- 1 ERCOT nodeResource nodes with prices
- Location
- Throckmorton County, TX33.1691, −99.2660
- EIA plant ID
- 64164EIA plant page
Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.
How much power Azure Sky Wind Project, LLC Hybrid produces
Free · EIA-923Net generation, 2025
1.21 TWh
1,207,187 MWh, final
Capacity factor, 2025
39.8%
2024: Not reported
January to July 2026
771 GWh
Provisional
| Year | Net generation, MWh | Capacity factor | Months reported |
|---|---|---|---|
| 2000 | Not reported | Not reported | 0 of 12 |
| 2001 | Not reported | Not reported | 0 of 12 |
| 2002 | Not reported | Not reported | 0 of 12 |
| 2003 | Not reported | Not reported | 0 of 12 |
| 2004 | Not reported | Not reported | 0 of 12 |
| 2005 | Not reported | Not reported | 0 of 12 |
| 2006 | Not reported | Not reported | 0 of 12 |
| 2007 | Not reported | Not reported | 0 of 12 |
| 2008 | Not reported | Not reported | 0 of 12 |
| 2009 | Not reported | Not reported | 0 of 12 |
| 2010 | Not reported | Not reported | 0 of 12 |
| 2011 | Not reported | Not reported | 0 of 12 |
| 2012 | Not reported | Not reported | 0 of 12 |
| 2013 | Not reported | Not reported | 0 of 12 |
| 2014 | Not reported | Not reported | 0 of 12 |
| 2015 | Not reported | Not reported | 0 of 12 |
| 2016 | Not reported | Not reported | 0 of 12 |
| 2017 | Not reported | Not reported | 0 of 12 |
| 2018 | Not reported | Not reported | 0 of 12 |
| 2019 | Not reported | Not reported | 0 of 12 |
| 2020 | Not reported | Not reported | 0 of 12 |
| 2021 | Not reported | Not reported | 0 of 12 |
| 2022 | Not reported | Not reported | 0 of 12 |
| 2023 | 369,253 | Not reported | 4 of 12 |
| 2024 | 842,225 | Not reported | 9 of 12 |
| 2025 | 1,207,187 | 39.8% | 12 of 12 |
| 2026 (provisional, partial year) | 770,979 | 43.8% | 7 of 7 |
* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.
Power prices and basis
Free account · ERCOTEmissions
Free · EPA CAMPDNo EPA emissions units are linked to this plant.
Water use
Free · EIA-923 cooling, USGSNo EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.
Generators
Free · EIA-860M| Generator | Technology | Nameplate MW | Online since |
|---|---|---|---|
| ASWBE | Batteries | 120.0 | December 2023 |
| ASWWT | Onshore Wind Turbine | 350.2 | August 2024 |
Ownership and offtake
ProOwnership and offtake are part of Pro
Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Azure Sky Wind Project, LLC as the operator, which is not always the owner.
Modeled data
ProPro adds modeled values for this plant. Everything above stays free.
Modeled curtailment
A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.
Expected vs reported generation
Monthly modeled expected output and physical potential next to EIA-923 reported output.
300 analyst questions a month, plus MCP
Query Azure Sky Wind Project, LLC Hybrid and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.
Power plants near Azure Sky Wind Project, LLC Hybrid
Questions about Azure Sky Wind Project, LLC Hybrid
How much power does Azure Sky Wind Project, LLC Hybrid produce?
Azure Sky Wind Project, LLC Hybrid reported 1,207,187 MWh (1.21 TWh) of net generation in 2025, a 39.8% capacity factor on 470.2 MW of nameplate capacity. From January to July 2026 it reported 771 GWh, which is provisional.
Where is Azure Sky Wind Project, LLC Hybrid?
Azure Sky Wind Project, LLC Hybrid is in Throckmorton County, Texas, at 33.1691, −99.2660. It is in the Electric Reliability Council of Texas, Inc. balancing area (ERCO).
Who operates Azure Sky Wind Project, LLC Hybrid?
EIA-860M for August 2026 lists Azure Sky Wind Project, LLC as the operator (EIA operator ID 63784). The operator is not always the owner.
Is Azure Sky Wind Project, LLC Hybrid a wind or a battery storage plant?
Both. Wind capacity totals 350.2 MW and battery storage capacity totals 120 MW.
When did Azure Sky Wind Project, LLC Hybrid start operating?
Its first generator began operating in December 2023, according to EIA-860M.
Does InfraMap have power prices for Azure Sky Wind Project, LLC Hybrid?
Yes. InfraMap has ERCOT day-ahead and real-time prices at 1 price node linked to Azure Sky Wind Project, LLC Hybrid, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.
Sources
- EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
- EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
- ERCOT day-ahead and real-time prices; node and hub assignments as of 2026-10-05
- Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)
Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page