WindOperatingMISO

Sac County Wind, LLC

Wind power plant in Sac County, Iowa. 80 MW of nameplate capacity across 1 generator, operated by Sac County Wind.

Also known as Sac County Wind (Richland Wind) · EIA plant 64662

Analyst: free account, 1 question a day.

Richland (IA)Pomeroy Wind FarmCarroll Wind FarmIntrepidVictory Wind FarmSac County Wind20 km
Open in the map
6 plants within 36 km, from EIA coordinates.

Key facts

Capacity
80 MWNameplate
Generators
1 operatingEIA-860M, August 2026
Operating since
December 2021First generator online
Operator
Sac County WindEIA operator ID 64261
Grid
MISOBalancing authority MISO
Price nodes
1 MISO nodeResource nodes with prices
Location
Sac County, IA42.4212, −94.9951
EIA plant ID
64662EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Sac County Wind produces

Free · EIA-923

Net generation, 2025

321 GWh

321,002 MWh, final

Capacity factor, 2025

45.8%

2024: 48.3%

January to July 2026

194 GWh

Provisional

Range, 2022 to 2025

321.0–373.0

GWh a year. Low 2025, high 2022

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
2006Not reportedNot reported0 of 12
2007Not reportedNot reported0 of 12
2008Not reportedNot reported0 of 12
2009Not reportedNot reported0 of 12
2010Not reportedNot reported0 of 12
2011Not reportedNot reported0 of 12
2012Not reportedNot reported0 of 12
2013Not reportedNot reported0 of 12
2014Not reportedNot reported0 of 12
2015Not reportedNot reported0 of 12
2016Not reportedNot reported0 of 12
2017Not reportedNot reported0 of 12
2018Not reportedNot reported0 of 12
2019Not reportedNot reported0 of 12
2020Not reportedNot reported0 of 12
202113,905Not reported1 of 12
2022373,02853.2%12 of 12
2023328,55846.9%12 of 12
2024339,43448.3%12 of 12
2025321,00245.8%12 of 12
2026 (provisional, partial year)194,11947.7%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · MISO

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
SACOnshore Wind Turbine80.0December 2021

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Sac County Wind as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Modeled curtailment

A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.

Modeled

Expected vs reported generation

Monthly modeled expected output and physical potential next to EIA-923 reported output.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Sac County Wind, LLC and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Sac County Wind

Questions about Sac County Wind

How much power does Sac County Wind, LLC produce?

Sac County Wind, LLC reported 321,002 MWh (321 GWh) of net generation in 2025, a 45.8% capacity factor on 80 MW of nameplate capacity. From January to July 2026 it reported 194 GWh, which is provisional.

Where is Sac County Wind, LLC?

Sac County Wind, LLC is in Sac County, Iowa, at 42.4212, −94.9951. It is in the Midcontinent Independent Transmission System Operator, Inc.. balancing area (MISO).

Who operates Sac County Wind, LLC?

EIA-860M for August 2026 lists Sac County Wind as the operator (EIA operator ID 64261). The operator is not always the owner.

When did Sac County Wind, LLC start operating?

Its first generator began operating in December 2021, according to EIA-860M.

Does InfraMap have power prices for Sac County Wind, LLC?

Yes. InfraMap has MISO day-ahead and real-time prices at 1 price node linked to Sac County Wind, LLC, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • MISO day-ahead and real-time prices; node and hub assignments as of 2026-10-05
  • Project names from the USGS U.S. Wind Turbine Database

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page