HydroOperatingNEVP

Washoe

Hydro power plant in Washoe County, Nevada. 2.6 MW of nameplate capacity across 2 generators, operated by Truckee Meadows Water Authority.

Also known as EIA plant 6532

Analyst: free account, 1 question a day.

VerdiFleishGalena 3 Geothermal Power PlantGalena 2 Geothermal Power PlantWashoe10 km
Open in the map
6 plants within 19 km, from EIA coordinates.

Key facts

Capacity
2.6 MWNameplate
Generators
2 operatingEIA-860M, August 2026
Operating since
January 1904First generator online
Operator
Truckee Meadows Water AuthorityEIA operator ID 56369
Grid
NEVPBalancing authority NEVP
Price nodes
None linkedNo verified ISO node
Location
Washoe County, NV39.3022, −119.5604
EIA plant ID
6532EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Washoe produces

Free · EIA-923

Net generation, 2025

14.9 GWh

14,901 MWh, final

Capacity factor, 2025

65.4%

2024: 63.0%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2015 to 2025

2.6–14.9

GWh a year. Low 2015, high 2025

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
200015,820Not reported12 of 12
200115,494Not reported12 of 12
200210,892Not reported12 of 12
200313,075Not reported12 of 12
20049,194Not reported12 of 12
200510,969Not reported12 of 12
20069,265Not reported12 of 12
200710,108Not reported12 of 12
20083,604Not reported12 of 12
200911,197Not reported12 of 12
201012,94956.9%12 of 12
201114,54563.9%12 of 12
201213,21357.9%12 of 12
201312,65855.6%12 of 12
20147,53633.1%12 of 12
20152,61211.5%12 of 12
20168,27936.3%12 of 12
20179,43741.4%12 of 12
201812,15053.3%12 of 12
201913,44659.0%12 of 12
20203,23314.2%12 of 12
20213,25514.3%12 of 12
20229,82943.2%12 of 12
202311,13348.9%12 of 12
202414,38963.0%12 of 12
202514,90165.4%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
1Conventional Hydroelectric1.3January 1904
2Conventional Hydroelectric1.3January 1904

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Truckee Meadows Water Authority as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Washoe and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Washoe

More plants operated by Truckee Meadows Water Authority

Questions about Washoe

How much power does Washoe produce?

Washoe reported 14,901 MWh (14.9 GWh) of net generation in 2025, a 65.4% capacity factor on 2.6 MW of nameplate capacity.

Where is Washoe?

Washoe is in Washoe County, Nevada, at 39.3022, −119.5604. It is in the Nevada Power Company balancing area (NEVP).

Who operates Washoe?

EIA-860M for August 2026 lists Truckee Meadows Water Authority as the operator (EIA operator ID 56369). The operator is not always the owner.

When did Washoe start operating?

Its first generator began operating in January 1904, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page