Natural gasOperatingERCOT

Mark One Power Station

Natural gas power plant in Brazoria County, Texas. 484 MW of nameplate capacity across 8 generators, operated by City of San Antonio - (TX).

Also known as ProEnergy Mark One Power Plant · EIA plant 65372

Analyst: free account, 1 question a day.

Gambit Energy Storage - Angleton StorageLongbow BESS, LLCMark One5 km
Open in the map
6 plants within 15 km, from EIA coordinates.

Key facts

Capacity
484 MWNameplate
Generators
8 operatingEIA-860M, August 2026
Operating since
November 2022First generator online
Operator
City of San Antonio - (TX)EIA operator ID 16604
Grid
ERCOTBalancing authority ERCO
Price nodes
1 ERCOT nodeResource nodes with prices
Location
Brazoria County, TX29.2271, −95.4308
EIA plant ID
65372EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Mark One produces

Free · EIA-923

Net generation, 2025

353 GWh

352,736 MWh, final

Capacity factor, 2025

8.3%

2024: Not reported

January to July 2026

221 GWh

Provisional

Range, 2023 to 2025

115.1–352.7

GWh a year. Low 2023, high 2025

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
2006Not reportedNot reported0 of 12
2007Not reportedNot reported0 of 12
2008Not reportedNot reported0 of 12
2009Not reportedNot reported0 of 12
2010Not reportedNot reported0 of 12
2011Not reportedNot reported0 of 12
2012Not reportedNot reported0 of 12
2013Not reportedNot reported0 of 12
2014Not reportedNot reported0 of 12
2015Not reportedNot reported0 of 12
2016Not reportedNot reported0 of 12
2017Not reportedNot reported0 of 12
2018Not reportedNot reported0 of 12
2019Not reportedNot reported0 of 12
2020Not reportedNot reported0 of 12
2021Not reportedNot reported0 of 12
202234,277Not reported4 of 12
2023115,1083.6%12 of 12
2024329,288Not reported12 of 12
2025352,7368.3%12 of 12
2026 (provisional, partial year)220,8059.0%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · ERCOT

Emissions

Free · EPA CAMPD

CO₂, 2025

220,781

US short tons. 2024: 203,492

SO₂, 2025

1

US short tons

NOx, 2025

20

US short tons

CO₂ per MWh, calculated

0.63 t

About 1,252 lb per MWh

8 of 8 EPA units reported CO₂ in 2025 (CT-1, CT-2, CT-3, CT-4, CT-5, CT-6, CT-7, CT-8), matched to EIA plant 65372 through the EPA–EIA crosswalk. The per-MWh rate is EPA CO₂ divided by EIA-923 net generation. The two reporting boundaries can differ.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
CTG-1Natural Gas Fired Combustion Turbine60.5November 2022
CTG-2Natural Gas Fired Combustion Turbine60.5November 2022
CTG-3Natural Gas Fired Combustion Turbine60.5November 2022
CTG-4Natural Gas Fired Combustion Turbine60.5November 2022
CTG-5Natural Gas Fired Combustion Turbine60.5November 2022
CTG-6Natural Gas Fired Combustion Turbine60.5November 2022
CTG-7Natural Gas Fired Combustion Turbine60.5October 2024
CTG-8Natural Gas Fired Combustion Turbine60.5October 2024

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists City of San Antonio - (TX) as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Mark One Power Station and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Mark One

More plants operated by City of San Antonio - (TX)

Questions about Mark One

How much power does Mark One Power Station produce?

Mark One Power Station reported 352,736 MWh (353 GWh) of net generation in 2025, a 8.3% capacity factor on 484 MW of nameplate capacity. From January to July 2026 it reported 221 GWh, which is provisional.

Where is Mark One Power Station?

Mark One Power Station is in Brazoria County, Texas, at 29.2271, −95.4308. It is in the Electric Reliability Council of Texas, Inc. balancing area (ERCO).

Who operates Mark One Power Station?

EIA-860M for August 2026 lists City of San Antonio - (TX) as the operator (EIA operator ID 16604). The operator is not always the owner.

When did Mark One Power Station start operating?

Its first generator began operating in November 2022, according to EIA-860M.

Does InfraMap have power prices for Mark One Power Station?

Yes. InfraMap has ERCOT day-ahead and real-time prices at 1 price node linked to Mark One Power Station, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
  • ERCOT day-ahead and real-time prices; node and hub assignments as of 2026-10-05
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page