HydroOperatingSPP

Gavins Point

Hydro power plant in Cedar County, Nebraska. 132.3 MW of nameplate capacity across 3 generators, operated by USACE-Omaha.

Also known as Gavins Point Dam Powerhouse · EIA plant 6624

Analyst: free account, 1 question a day.

Crofton Bluffs Wind LLCElkhorn Ridge Wind LLCPrevailing Wind ParkSpirit MoundOsmond 1Beethoven WindGavins Point25 km
Open in the map
6 plants within 60 km, from EIA coordinates.

Key facts

Capacity
132.3 MWNameplate
Generators
3 operatingEIA-860M, August 2026
Operating since
September 1956First generator online
Operator
USACE-OmahaEIA operator ID 19635
Grid
SPPBalancing authority SWPP
Price nodes
1 SPP nodeResource nodes with prices
Location
Cedar County, NE42.8488, −97.4815
EIA plant ID
6624EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Gavins Point produces

Free · EIA-923

Net generation, 2025

694 GWh

693,953 MWh, final

Capacity factor, 2025

59.9%

2024: 61.3%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2015 to 2025

638.1–886.3

GWh a year. Low 2019, high 2015

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000823,852Not reported12 of 12
2001617,978Not reported12 of 12
2002706,182Not reported12 of 12
2003657,879Not reported12 of 12
2004619,386Not reported12 of 12
2005569,769Not reported12 of 12
2006589,181Not reported12 of 12
2007474,436Not reported12 of 12
2008472,754Not reported12 of 12
2009584,337Not reported12 of 12
2010584,33750.4%12 of 12
2011627,38554.1%12 of 12
2012735,71063.3%12 of 12
2013671,40357.9%12 of 12
2014652,84856.3%12 of 12
2015886,33476.5%12 of 12
2016673,02257.9%12 of 12
2017795,25068.6%12 of 12
2018721,44962.3%12 of 12
2019638,13155.1%12 of 12
2020692,04259.5%12 of 12
2021663,36757.2%12 of 12
2022685,25559.1%12 of 12
2023715,29461.7%12 of 12
2024712,55561.3%12 of 12
2025693,95359.9%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · SPP

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
1Conventional Hydroelectric44.1September 1956
2Conventional Hydroelectric44.1October 1956
3Conventional Hydroelectric44.1January 1957

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists USACE-Omaha as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Gavins Point and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Gavins Point

More plants operated by USACE-Omaha

Questions about Gavins Point

How much power does Gavins Point produce?

Gavins Point reported 693,953 MWh (694 GWh) of net generation in 2025, a 59.9% capacity factor on 132.3 MW of nameplate capacity.

Where is Gavins Point?

Gavins Point is in Cedar County, Nebraska, at 42.8488, −97.4815. It is in the Southwest Power Pool balancing area (SWPP).

Who operates Gavins Point?

EIA-860M for August 2026 lists USACE-Omaha as the operator (EIA operator ID 19635). The operator is not always the owner.

When did Gavins Point start operating?

Its first generator began operating in September 1956, according to EIA-860M.

Does InfraMap have power prices for Gavins Point?

Yes. InfraMap has SPP day-ahead and real-time prices at 1 price node linked to Gavins Point, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • SPP day-ahead and real-time prices; node and hub assignments as of 2026-10-05
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page