Harvest Gold Solar
Solar power plant in Sunflower County, Mississippi. 99 MW of nameplate capacity across 1 generator, operated by Harvest Gold Solar Power, LLC.
Also known as EIA plant 66623
Analyst: free account, 1 question a day.
Key facts
- Capacity
- 99 MWNameplate
- Generators
- 1 operatingEIA-860M, August 2026
- Operating since
- August 2024First generator online
- Operator
- Harvest Gold Solar Power, LLCEIA operator ID 65650
- Grid
- MISOBalancing authority MISO
- Price nodes
- 1 MISO nodeResource nodes with prices
- Location
- Sunflower County, MS33.5050, −90.6360
- EIA plant ID
- 66623EIA plant page
Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.
How much power Harvest Gold Solar produces
Free · EIA-923Net generation, 2025
181 GWh
180,543 MWh, final
Capacity factor, 2025
20.8%
2024: Not reported
January to July 2026
130 GWh
Provisional
| Year | Net generation, MWh | Capacity factor | Months reported |
|---|---|---|---|
| 2000 | Not reported | Not reported | 0 of 12 |
| 2001 | Not reported | Not reported | 0 of 12 |
| 2002 | Not reported | Not reported | 0 of 12 |
| 2003 | Not reported | Not reported | 0 of 12 |
| 2004 | Not reported | Not reported | 0 of 12 |
| 2005 | Not reported | Not reported | 0 of 12 |
| 2006 | Not reported | Not reported | 0 of 12 |
| 2007 | Not reported | Not reported | 0 of 12 |
| 2008 | Not reported | Not reported | 0 of 12 |
| 2009 | Not reported | Not reported | 0 of 12 |
| 2010 | Not reported | Not reported | 0 of 12 |
| 2011 | Not reported | Not reported | 0 of 12 |
| 2012 | Not reported | Not reported | 0 of 12 |
| 2013 | Not reported | Not reported | 0 of 12 |
| 2014 | Not reported | Not reported | 0 of 12 |
| 2015 | Not reported | Not reported | 0 of 12 |
| 2016 | Not reported | Not reported | 0 of 12 |
| 2017 | Not reported | Not reported | 0 of 12 |
| 2018 | Not reported | Not reported | 0 of 12 |
| 2019 | Not reported | Not reported | 0 of 12 |
| 2020 | Not reported | Not reported | 0 of 12 |
| 2021 | Not reported | Not reported | 0 of 12 |
| 2022 | Not reported | Not reported | 0 of 12 |
| 2023 | Not reported | Not reported | 0 of 12 |
| 2024 | 137,490 | Not reported | 9 of 12 |
| 2025 | 180,543 | 20.8% | 12 of 12 |
| 2026 (provisional, partial year) | 130,172 | 25.8% | 7 of 7 |
* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.
Power prices and basis
Free account · MISOEmissions
Free · EPA CAMPDNo EPA emissions units are linked to this plant.
Water use
Free · EIA-923 cooling, USGSNo EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.
Generators
Free · EIA-860M| Generator | Technology | Nameplate MW | Online since |
|---|---|---|---|
| HGS | Solar Photovoltaic | 99.0 | August 2024 |
Ownership and offtake
ProOwnership and offtake are part of Pro
Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Harvest Gold Solar Power, LLC as the operator, which is not always the owner.
Modeled data
ProPro adds modeled values for this plant. Everything above stays free.
Modeled curtailment
A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.
Expected vs reported generation
Monthly modeled expected output and physical potential next to EIA-923 reported output.
300 analyst questions a month, plus MCP
Query Harvest Gold Solar and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.
Power plants near Harvest Gold Solar
Questions about Harvest Gold Solar
How much power does Harvest Gold Solar produce?
Harvest Gold Solar reported 180,543 MWh (181 GWh) of net generation in 2025, a 20.8% capacity factor on 99 MW of nameplate capacity. From January to July 2026 it reported 130 GWh, which is provisional.
Where is Harvest Gold Solar?
Harvest Gold Solar is in Sunflower County, Mississippi, at 33.5050, −90.6360. It is in the Midcontinent Independent Transmission System Operator, Inc.. balancing area (MISO).
Who operates Harvest Gold Solar?
EIA-860M for August 2026 lists Harvest Gold Solar Power, LLC as the operator (EIA operator ID 65650). The operator is not always the owner.
When did Harvest Gold Solar start operating?
Its first generator began operating in August 2024, according to EIA-860M.
Does InfraMap have power prices for Harvest Gold Solar?
Yes. InfraMap has MISO day-ahead and real-time prices at 1 price node linked to Harvest Gold Solar, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.
Sources
- EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
- EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
- MISO day-ahead and real-time prices; node and hub assignments as of 2026-10-05
Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page