SolarOperatingPJM

Martin County Solar Project, LLC

Solar power plant in Martin County, Kentucky. 111 MW of nameplate capacity across 1 generator, operated by Martin County Solar Project, LLC.

Also known as Martin County Solar Project · EIA plant 66646

Analyst: free account, 1 question a day.

Big SandyRiverside Generating LLCMartin County Solar Project25 km
Open in the map
2 plants within 49 km, from EIA coordinates.

Key facts

Capacity
111 MWNameplate
Generators
1 operatingEIA-860M, August 2026
Operating since
December 2024First generator online
Operator
Martin County Solar Project, LLCEIA operator ID 65671
Grid
PJMBalancing authority PJM
Price nodes
1 PJM nodeResource nodes with prices
Location
Martin County, KY37.7655, −82.4741
EIA plant ID
66646EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Martin County Solar Project produces

Free · EIA-923

Net generation, 2025

211 GWh

210,877 MWh, final

Capacity factor, 2025

21.7%

2024: Not reported

January to July 2026

144 GWh

Provisional

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
2006Not reportedNot reported0 of 12
2007Not reportedNot reported0 of 12
2008Not reportedNot reported0 of 12
2009Not reportedNot reported0 of 12
2010Not reportedNot reported0 of 12
2011Not reportedNot reported0 of 12
2012Not reportedNot reported0 of 12
2013Not reportedNot reported0 of 12
2014Not reportedNot reported0 of 12
2015Not reportedNot reported0 of 12
2016Not reportedNot reported0 of 12
2017Not reportedNot reported0 of 12
2018Not reportedNot reported0 of 12
2019Not reportedNot reported0 of 12
2020Not reportedNot reported0 of 12
2021Not reportedNot reported0 of 12
2022Not reportedNot reported0 of 12
2023Not reportedNot reported0 of 12
20247,147Not reported1 of 12
2025210,87721.7%12 of 12
2026 (provisional, partial year)144,40325.6%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · PJM

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
USMTCSolar Photovoltaic111.0December 2024

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Martin County Solar Project, LLC as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Modeled curtailment

A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.

Modeled

Expected vs reported generation

Monthly modeled expected output and physical potential next to EIA-923 reported output.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Martin County Solar Project, LLC and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Martin County Solar Project

Questions about Martin County Solar Project

How much power does Martin County Solar Project, LLC produce?

Martin County Solar Project, LLC reported 210,877 MWh (211 GWh) of net generation in 2025, a 21.7% capacity factor on 111 MW of nameplate capacity. From January to July 2026 it reported 144 GWh, which is provisional.

Where is Martin County Solar Project, LLC?

Martin County Solar Project, LLC is in Martin County, Kentucky, at 37.7655, −82.4741. It is in the PJM Interconnection, LLC balancing area (PJM).

Who operates Martin County Solar Project, LLC?

EIA-860M for August 2026 lists Martin County Solar Project, LLC as the operator (EIA operator ID 65671). The operator is not always the owner.

When did Martin County Solar Project, LLC start operating?

Its first generator began operating in December 2024, according to EIA-860M.

Does InfraMap have power prices for Martin County Solar Project, LLC?

Yes. InfraMap has PJM day-ahead and real-time prices at 1 price node linked to Martin County Solar Project, LLC, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • PJM day-ahead and real-time prices; node and hub assignments as of 2026-10-05
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page