Natural gasOperatingTEC

South Tampa Resilience Project

Natural gas power plant in Hillsborough County, Florida. 75.2 MW of nameplate capacity across 4 generators, operated by Tampa Electric Co.

Also known as EIA plant 66920

Analyst: free account, 1 question a day.

P L BartowH L Culbreath Bayside Power StationTIA SolarMcKay Bay Facility5 km
Open in the map
6 plants within 13 km, from EIA coordinates.

Key facts

Capacity
75.2 MWNameplate
Generators
4 operatingEIA-860M, August 2026
Operating since
February 2025First generator online
Operator
Tampa Electric CoEIA operator ID 18454
Grid
TECBalancing authority TEC
Price nodes
None linkedNo verified ISO node
Location
Hillsborough County, FL27.8633, −82.5174
EIA plant ID
66920EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power South Tampa Resilience Project produces

Free · EIA-923

Net generation, 2025

22.6 GWh

22,609 MWh, final. 11 of 12 months reported

Capacity factor, 2025

Not reported

2024: Not reported

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
2006Not reportedNot reported0 of 12
2007Not reportedNot reported0 of 12
2008Not reportedNot reported0 of 12
2009Not reportedNot reported0 of 12
2010Not reportedNot reported0 of 12
2011Not reportedNot reported0 of 12
2012Not reportedNot reported0 of 12
2013Not reportedNot reported0 of 12
2014Not reportedNot reported0 of 12
2015Not reportedNot reported0 of 12
2016Not reportedNot reported0 of 12
2017Not reportedNot reported0 of 12
2018Not reportedNot reported0 of 12
2019Not reportedNot reported0 of 12
2020Not reportedNot reported0 of 12
2021Not reportedNot reported0 of 12
2022Not reportedNot reported0 of 12
2023Not reportedNot reported0 of 12
2024Not reportedNot reported0 of 12
202522,609Not reported11 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
MPS01Natural Gas Internal Combustion Engine18.8February 2025
MPS02Natural Gas Internal Combustion Engine18.8February 2025
MPS03Natural Gas Internal Combustion Engine18.8December 2025
MPS04Natural Gas Internal Combustion Engine18.8December 2025

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Tampa Electric Co as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query South Tampa Resilience Project and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near South Tampa Resilience Project

More plants operated by Tampa Electric Co

Questions about South Tampa Resilience Project

How much power does South Tampa Resilience Project produce?

South Tampa Resilience Project reported 22,609 MWh (22.6 GWh) of net generation in 2025. 11 of 12 months were reported for 2025.

Where is South Tampa Resilience Project?

South Tampa Resilience Project is in Hillsborough County, Florida, at 27.8633, −82.5174. It is in the Tampa Electric Company balancing area (TEC).

Who operates South Tampa Resilience Project?

EIA-860M for August 2026 lists Tampa Electric Co as the operator (EIA operator ID 18454). The operator is not always the owner.

When did South Tampa Resilience Project start operating?

Its first generator began operating in February 2025, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page