Bayside Battery Storage
Battery storage project in Hillsborough County, Florida. 20 MW of nameplate capacity across 1 generator, operated by Tampa Electric Co.
Also known as EIA plant 69165
Analyst: free account, 1 question a day.
Key facts
- Capacity
- 20 MWNameplate
- Generators
- 1 operatingEIA-860M, August 2026
- Operating since
- April 2026First generator online
- Operator
- Tampa Electric CoEIA operator ID 18454
- Grid
- TECBalancing authority TEC
- Price nodes
- None linkedNo verified ISO node
- Location
- Hillsborough County, FL27.9075, −82.4113
- EIA plant ID
- 69165EIA plant page
Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.
How much power Bayside Battery Storage produces
Free · EIA-923EIA-923 has no net generation reported for this plant.
Power prices and basis
Free accountNo verified ISO price node is linked to this plant, or its price history could not load.
Emissions
Free · EPA CAMPDNo EPA emissions units are linked to this plant.
Water use
Free · EIA-923 cooling, USGSNo EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.
Generators
Free · EIA-860M| Generator | Technology | Nameplate MW | Online since |
|---|---|---|---|
| BESS1 | Batteries | 20.0 | April 2026 |
Ownership and offtake
ProOwnership and offtake are part of Pro
Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Tampa Electric Co as the operator, which is not always the owner.
Modeled data
ProPro adds modeled values for this plant. Everything above stays free.
300 analyst questions a month, plus MCP
Query Bayside Battery Storage and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.
Power plants near Bayside Battery Storage
More plants operated by Tampa Electric Co
Questions about Bayside Battery Storage
Where is Bayside Battery Storage?
Bayside Battery Storage is in Hillsborough County, Florida, at 27.9075, −82.4113. It is in the Tampa Electric Company balancing area (TEC).
Who operates Bayside Battery Storage?
EIA-860M for August 2026 lists Tampa Electric Co as the operator (EIA operator ID 18454). The operator is not always the owner.
When did Bayside Battery Storage start operating?
Its first generator began operating in April 2026, according to EIA-860M.