Pine 1 Solar
Solar power plant in Beaver County, Pennsylvania. 17.1 MW of nameplate capacity across 1 generator, operated by BE-Pine1 LLC.
Also known as EIA plant 66943
Analyst: free account, 1 question a day.
Key facts
- Capacity
- 17.1 MWNameplate
- Generators
- 1 operatingEIA-860M, August 2026
- Operating since
- November 2023First generator online
- Operator
- BE-Pine1 LLCEIA operator ID 65854
- Grid
- PJMBalancing authority PJM
- Price nodes
- 1 PJM nodeResource nodes with prices
- Location
- Beaver County, PA40.6165, −80.4582
- EIA plant ID
- 66943EIA plant page
Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.
How much power Pine 1 Solar produces
Free · EIA-923Net generation, 2025
28.5 GWh
28,541 MWh, final
Capacity factor, 2025
19.1%
2024: 17.6%
January to July 2026
Not reported
Provisional. 0 of 7 months reported
Range, 2023 to 2025
0.6–28.5
GWh a year. Low 2023, high 2025
| Year | Net generation, MWh | Capacity factor | Months reported |
|---|---|---|---|
| 2000 | Not reported | Not reported | 0 of 12 |
| 2001 | Not reported | Not reported | 0 of 12 |
| 2002 | Not reported | Not reported | 0 of 12 |
| 2003 | Not reported | Not reported | 0 of 12 |
| 2004 | Not reported | Not reported | 0 of 12 |
| 2005 | Not reported | Not reported | 0 of 12 |
| 2006 | Not reported | Not reported | 0 of 12 |
| 2007 | Not reported | Not reported | 0 of 12 |
| 2008 | Not reported | Not reported | 0 of 12 |
| 2009 | Not reported | Not reported | 0 of 12 |
| 2010 | Not reported | Not reported | 0 of 12 |
| 2011 | Not reported | Not reported | 0 of 12 |
| 2012 | Not reported | Not reported | 0 of 12 |
| 2013 | Not reported | Not reported | 0 of 12 |
| 2014 | Not reported | Not reported | 0 of 12 |
| 2015 | Not reported | Not reported | 0 of 12 |
| 2016 | Not reported | Not reported | 0 of 12 |
| 2017 | Not reported | Not reported | 0 of 12 |
| 2018 | Not reported | Not reported | 0 of 12 |
| 2019 | Not reported | Not reported | 0 of 12 |
| 2020 | Not reported | Not reported | 0 of 12 |
| 2021 | Not reported | Not reported | 0 of 12 |
| 2022 | Not reported | Not reported | 0 of 12 |
| 2023 | 623 | Not reported | 12 of 12 |
| 2024 | 26,448 | 17.6% | 12 of 12 |
| 2025 | 28,541 | 19.1% | 12 of 12 |
| 2026 (provisional, partial year) | Not reported | Not reported | 0 of 7 |
* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.
Power prices and basis
Free account · PJMEmissions
Free · EPA CAMPDNo EPA emissions units are linked to this plant.
Water use
Free · EIA-923 cooling, USGSNo EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.
Generators
Free · EIA-860M| Generator | Technology | Nameplate MW | Online since |
|---|---|---|---|
| 2-114 | Solar Photovoltaic | 17.1 | November 2023 |
Ownership and offtake
ProOwnership and offtake are part of Pro
Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists BE-Pine1 LLC as the operator, which is not always the owner.
Modeled data
ProPro adds modeled values for this plant. Everything above stays free.
Modeled curtailment
A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.
Expected vs reported generation
Monthly modeled expected output and physical potential next to EIA-923 reported output.
300 analyst questions a month, plus MCP
Query Pine 1 Solar and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.
Power plants near Pine 1 Solar
Questions about Pine 1 Solar
How much power does Pine 1 Solar produce?
Pine 1 Solar reported 28,541 MWh (28.5 GWh) of net generation in 2025, a 19.1% capacity factor on 17.1 MW of nameplate capacity.
Where is Pine 1 Solar?
Pine 1 Solar is in Beaver County, Pennsylvania, at 40.6166, −80.4582. It is in the PJM Interconnection, LLC balancing area (PJM).
Who operates Pine 1 Solar?
EIA-860M for August 2026 lists BE-Pine1 LLC as the operator (EIA operator ID 65854). The operator is not always the owner.
When did Pine 1 Solar start operating?
Its first generator began operating in November 2023, according to EIA-860M.
Does InfraMap have power prices for Pine 1 Solar?
Yes. InfraMap has PJM day-ahead and real-time prices at 1 price node linked to Pine 1 Solar, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.
Sources
- EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
- EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
- PJM day-ahead and real-time prices; node and hub assignments as of 2026-10-05
Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page