SolarBattery storageOperatingMISO

Cavalry Solar Hybrid

Solar project in White County, Indiana. 245 MW of nameplate capacity across 2 generators, operated by Cavalry Energy Center LLC.

Also known as EIA plant 67489

This project groups Cavalry Solar Hybrid (EIA 67489). EIA reports them as separate plants.

Analyst: free account, 1 question a day.

Liberty I & II LFGTENorway (IN)Rosewater Wind FarmIndiana Crossroads So…Cavalry Solar Hybrid10 km
Open in the map
6 plants within 20 km, from EIA coordinates.

Key facts

Capacity
245 MWSolar 200.0 · Battery storage 45.0
Generators
2 operatingEIA-860M, August 2026
Operating since
May 2024First generator online
Operator
Cavalry Energy Center LLCEIA operator ID 66219
Grid
MISOBalancing authority MISO
Price nodes
2 MISO nodesResource nodes with prices
Location
White County, IN40.8953, −86.8102
EIA plant ID
67489EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Cavalry Solar Hybrid produces

Free · EIA-923

Net generation, 2025

374 GWh

373,570 MWh, final

Capacity factor, 2025

22.0%

2024: Not reported

January to July 2026

230 GWh

Provisional

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
2006Not reportedNot reported0 of 12
2007Not reportedNot reported0 of 12
2008Not reportedNot reported0 of 12
2009Not reportedNot reported0 of 12
2010Not reportedNot reported0 of 12
2011Not reportedNot reported0 of 12
2012Not reportedNot reported0 of 12
2013Not reportedNot reported0 of 12
2014Not reportedNot reported0 of 12
2015Not reportedNot reported0 of 12
2016Not reportedNot reported0 of 12
2017Not reportedNot reported0 of 12
2018Not reportedNot reported0 of 12
2019Not reportedNot reported0 of 12
2020Not reportedNot reported0 of 12
2021Not reportedNot reported0 of 12
2022Not reportedNot reported0 of 12
2023Not reportedNot reported0 of 12
2024262,430Not reported8 of 12
2025373,57022.0%12 of 12
2026 (provisional, partial year)230,23323.6%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · MISO

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
CAVBSBatteries45.0May 2024
CAVPVSolar Photovoltaic200.0May 2024

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Cavalry Energy Center LLC as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Modeled curtailment

A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.

Modeled

Expected vs reported generation

Monthly modeled expected output and physical potential next to EIA-923 reported output.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Cavalry Solar Hybrid and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Cavalry Solar Hybrid

Questions about Cavalry Solar Hybrid

How much power does Cavalry Solar Hybrid produce?

Cavalry Solar Hybrid reported 373,570 MWh (374 GWh) of net generation in 2025, a 22.0% capacity factor on 245 MW of nameplate capacity. From January to July 2026 it reported 230 GWh, which is provisional.

Where is Cavalry Solar Hybrid?

Cavalry Solar Hybrid is in White County, Indiana, at 40.8953, −86.8102. It is in the Midcontinent Independent Transmission System Operator, Inc.. balancing area (MISO).

Who operates Cavalry Solar Hybrid?

EIA-860M for August 2026 lists Cavalry Energy Center LLC as the operator (EIA operator ID 66219). The operator is not always the owner.

When did Cavalry Solar Hybrid start operating?

Its first generator began operating in May 2024, according to EIA-860M.

Does InfraMap have power prices for Cavalry Solar Hybrid?

Yes. InfraMap has MISO day-ahead and real-time prices at 2 price nodes linked to Cavalry Solar Hybrid, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • MISO day-ahead and real-time prices; node and hub assignments as of 2026-10-05

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page