Natural gasCoalOperatingPSCO

Rawhide

Natural gas and coal power plant in Larimer County, Colorado. 800.4 MW of nameplate capacity across 6 generators, operated by Platte River Power Authority.

Also known as Rawhide Energy Station · EIA plant 6761

Analyst: free account, 1 question a day.

Roundhouse Renewable Energy IIRoundhouse Wind Energy ProjectSouth Cheyenne SolarRawhide10 km
Open in the map
6 plants within 28 km, from EIA coordinates.

Key facts

Capacity
800.4 MWNatural gas 506.8 · Coal 293.6
Generators
6 operatingEIA-860M, August 2026
Operating since
April 1984First generator online
Operator
Platte River Power AuthorityEIA operator ID 15143
Grid
PSCOBalancing authority PSCO
Price nodes
6 SPP nodesResource nodes with prices
Location
Larimer County, CO40.8609, −105.0212
EIA plant ID
6761EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Rawhide produces

Free · EIA-923

Net generation, 2025

1.33 TWh

1,333,884 MWh, final. 11 of 12 months reported

Capacity factor, 2025

20.7%

2024: 18.3%

January to July 2026

1.02 TWh

Provisional

Range, 2015 to 2024

1.3–2.3

TWh a year. Low 2024, high 2016

Annual net generation, TWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
20001,964,843Not reported12 of 12
20012,193,004Not reported12 of 12
20021,125,647Not reported7 of 12
20032,289,365Not reported12 of 12
20042,289,744Not reported12 of 12
20051,942,109Not reported12 of 12
20062,210,393Not reported12 of 12
20072,344,884Not reported12 of 12
20082,161,895Not reported12 of 12
20092,382,191Not reported12 of 12
20102,270,39232.4%12 of 12
20112,306,80832.9%12 of 12
20122,148,27130.6%12 of 12
20132,406,77834.3%12 of 12
20142,189,61431.2%12 of 12
20151,990,33428.4%12 of 12
20162,258,59832.1%12 of 12
20172,234,07131.9%12 of 12
20181,870,84926.7%12 of 12
20192,037,51929.1%12 of 12
20202,032,32028.9%12 of 12
20211,864,21026.6%12 of 12
20222,141,72430.5%12 of 12
20231,501,54621.4%12 of 12
20241,287,03618.3%12 of 12
20251,333,88420.7%11 of 12
2026 (provisional, partial year)1,020,57025.1%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · SPP

Emissions

Free · EPA CAMPD

CO₂, 2025

1.52M

US short tons. 2024: 1.34M

SO₂, 2025

482

US short tons

NOx, 2025

830

US short tons

6 of 6 EPA units reported CO₂ in 2025 (101, A, B, C, D, F), matched to EIA plant 6761 through the EPA–EIA crosswalk.

Water use

Free · EIA-923 cooling, USGS

Withdrawal, 2024

86,563

million gallons

Consumption, 2024

1,095

million gallons

Source

Municipal

Discharge, Reclaimed. Recirculating with cooling pond

Watershed stress

Very low/none · 0.152

USGS SUI, HUC12 Coal Creek

12 of 12 cooling months report withdrawal. Reclaimed water or plant effluent; not tested. Cooling-pond plants report water circulated through the pond as withdrawal, so withdrawal is far above consumption. Blank volumes are unreported, not zero.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
1Conventional Steam Coal293.6April 1984
ANatural Gas Fired Combustion Turbine89.3June 2002
BNatural Gas Fired Combustion Turbine89.3August 2002
CNatural Gas Fired Combustion Turbine89.3September 2002
DNatural Gas Fired Combustion Turbine89.3June 2004
FNatural Gas Fired Combustion Turbine149.6June 2008

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Platte River Power Authority as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Rawhide and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Rawhide

Questions about Rawhide

How much power does Rawhide produce?

Rawhide reported 1,333,884 MWh (1.33 TWh) of net generation in 2025, a 20.7% capacity factor on 800.4 MW of nameplate capacity. From January to July 2026 it reported 1.02 TWh, which is provisional. 11 of 12 months were reported for 2025.

Where is Rawhide?

Rawhide is in Larimer County, Colorado, at 40.8609, −105.0212. It is in the Public Service Company of Colorado balancing area (PSCO).

Who operates Rawhide?

EIA-860M for August 2026 lists Platte River Power Authority as the operator (EIA operator ID 15143). The operator is not always the owner.

Is Rawhide a natural gas or a coal plant?

Both. Natural gas capacity totals 506.8 MW and coal capacity totals 293.6 MW.

When did Rawhide start operating?

Its first generator began operating in April 1984, according to EIA-860M.

Does InfraMap have power prices for Rawhide?

Yes. InfraMap has SPP day-ahead and real-time prices at 6 price nodes linked to Rawhide, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
  • SPP day-ahead and real-time prices; node and hub assignments as of 2026-10-05
  • EIA-923 cooling water 2024 and the USGS surface water supply and use index, Water years 2010-2020 (Oct 2009 to Sep 2020), mean of monthly values
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page