SolarOperatingPJM

Capon Bridge Solar LLC

Solar power plant in Hampshire County, West Virginia. 20 MW of nameplate capacity across 1 generator, operated by Capon Bridge Solar LLC.

Also known as EIA plant 67694

Analyst: free account, 1 question a day.

Pinnacle Wind Force LLCThe Village at Orchard Ridge (TVOR)Foxglove SolarDans MountainBlack Rock WindCapon Bridge Solar25 km
Open in the map
6 plants within 41 km, from EIA coordinates.

Key facts

Capacity
20 MWNameplate
Generators
1 operatingEIA-860M, August 2026
Operating since
July 2024First generator online
Operator
Capon Bridge Solar LLCEIA operator ID 66335
Grid
PJMBalancing authority PJM
Price nodes
1 PJM nodeResource nodes with prices
Location
Hampshire County, WV39.2872, −78.6420
EIA plant ID
67694EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Capon Bridge Solar produces

Free · EIA-923

Net generation, 2025

34.0 GWh

33,955 MWh, final

Capacity factor, 2025

19.4%

2024: Not reported

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2024 to 2025

12.0–34.0

GWh a year. Low 2024, high 2025

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
2006Not reportedNot reported0 of 12
2007Not reportedNot reported0 of 12
2008Not reportedNot reported0 of 12
2009Not reportedNot reported0 of 12
2010Not reportedNot reported0 of 12
2011Not reportedNot reported0 of 12
2012Not reportedNot reported0 of 12
2013Not reportedNot reported0 of 12
2014Not reportedNot reported0 of 12
2015Not reportedNot reported0 of 12
2016Not reportedNot reported0 of 12
2017Not reportedNot reported0 of 12
2018Not reportedNot reported0 of 12
2019Not reportedNot reported0 of 12
2020Not reportedNot reported0 of 12
2021Not reportedNot reported0 of 12
2022Not reportedNot reported0 of 12
2023Not reportedNot reported0 of 12
202411,962Not reported12 of 12
202533,95519.4%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · PJM

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
CPS01Solar Photovoltaic20.0July 2024

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Capon Bridge Solar LLC as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Modeled curtailment

A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.

Modeled

Expected vs reported generation

Monthly modeled expected output and physical potential next to EIA-923 reported output.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Capon Bridge Solar LLC and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Capon Bridge Solar

Questions about Capon Bridge Solar

How much power does Capon Bridge Solar LLC produce?

Capon Bridge Solar LLC reported 33,955 MWh (34.0 GWh) of net generation in 2025, a 19.4% capacity factor on 20 MW of nameplate capacity.

Where is Capon Bridge Solar LLC?

Capon Bridge Solar LLC is in Hampshire County, West Virginia, at 39.2872, −78.6420. It is in the PJM Interconnection, LLC balancing area (PJM).

Who operates Capon Bridge Solar LLC?

EIA-860M for August 2026 lists Capon Bridge Solar LLC as the operator (EIA operator ID 66335). The operator is not always the owner.

When did Capon Bridge Solar LLC start operating?

Its first generator began operating in July 2024, according to EIA-860M.

Does InfraMap have power prices for Capon Bridge Solar LLC?

Yes. InfraMap has PJM day-ahead and real-time prices at 1 price node linked to Capon Bridge Solar LLC, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • PJM day-ahead and real-time prices; node and hub assignments as of 2026-10-05

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page