Pine Forest Solar I
Solar and battery storage project in Hopkins County, Texas. 500 MW of nameplate capacity across 2 generators, operated by Pine Forest Solar I, LLC.
Also known as EIA plant 68906
This project groups Pine Forest Solar I (EIA 68906). EIA reports them as separate plants.
Analyst: free account, 1 question a day.
Key facts
- Capacity
- 500 MWSolar 300.0 · Battery storage 200.0
- Generators
- 2 operatingEIA-860M, August 2026
- Operating since
- October 2025First generator online
- Operator
- Pine Forest Solar I, LLCEIA operator ID 67151
- Grid
- DOPDBalancing authority DOPD
- Price nodes
- None linkedNo verified ISO node
- Location
- Hopkins County, TX33.1008, −95.3923
- EIA plant ID
- 68906EIA plant page
Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.
How much power Pine Forest Solar I produces
Free · EIA-923Net generation, 2025
29.5 GWh
29,475 MWh, final. 1 of 12 months reported
Capacity factor, 2025
Not reported
2024: Not reported
January to July 2026
358 GWh
Provisional
| Year | Net generation, MWh | Capacity factor | Months reported |
|---|---|---|---|
| 2000 | Not reported | Not reported | 0 of 12 |
| 2001 | Not reported | Not reported | 0 of 12 |
| 2002 | Not reported | Not reported | 0 of 12 |
| 2003 | Not reported | Not reported | 0 of 12 |
| 2004 | Not reported | Not reported | 0 of 12 |
| 2005 | Not reported | Not reported | 0 of 12 |
| 2006 | Not reported | Not reported | 0 of 12 |
| 2007 | Not reported | Not reported | 0 of 12 |
| 2008 | Not reported | Not reported | 0 of 12 |
| 2009 | Not reported | Not reported | 0 of 12 |
| 2010 | Not reported | Not reported | 0 of 12 |
| 2011 | Not reported | Not reported | 0 of 12 |
| 2012 | Not reported | Not reported | 0 of 12 |
| 2013 | Not reported | Not reported | 0 of 12 |
| 2014 | Not reported | Not reported | 0 of 12 |
| 2015 | Not reported | Not reported | 0 of 12 |
| 2016 | Not reported | Not reported | 0 of 12 |
| 2017 | Not reported | Not reported | 0 of 12 |
| 2018 | Not reported | Not reported | 0 of 12 |
| 2019 | Not reported | Not reported | 0 of 12 |
| 2020 | Not reported | Not reported | 0 of 12 |
| 2021 | Not reported | Not reported | 0 of 12 |
| 2022 | Not reported | Not reported | 0 of 12 |
| 2023 | Not reported | Not reported | 0 of 12 |
| 2024 | Not reported | Not reported | 0 of 12 |
| 2025 | 29,475 | Not reported | 1 of 12 |
| 2026 (provisional, partial year) | 358,393 | 24.6% | 7 of 7 |
* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.
Power prices and basis
Free accountNo verified ISO price node is linked to this plant, or its price history could not load.
Emissions
Free · EPA CAMPDNo EPA emissions units are linked to this plant.
Water use
Free · EIA-923 cooling, USGSNo EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.
Generators
Free · EIA-860M| Generator | Technology | Nameplate MW | Online since |
|---|---|---|---|
| PFBA | Batteries | 200.0 | October 2025 |
| PFPV | Solar Photovoltaic | 300.0 | December 2025 |
Ownership and offtake
ProOwnership and offtake are part of Pro
Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Pine Forest Solar I, LLC as the operator, which is not always the owner.
Modeled data
ProPro adds modeled values for this plant. Everything above stays free.
Modeled curtailment
A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.
Expected vs reported generation
Monthly modeled expected output and physical potential next to EIA-923 reported output.
300 analyst questions a month, plus MCP
Query Pine Forest Solar I and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.
Power plants near Pine Forest Solar I
Questions about Pine Forest Solar I
How much power does Pine Forest Solar I produce?
Pine Forest Solar I reported 29,475 MWh (29.5 GWh) of net generation in 2025. From January to July 2026 it reported 358 GWh, which is provisional. 1 of 12 months were reported for 2025.
Where is Pine Forest Solar I?
Pine Forest Solar I is in Hopkins County, Texas, at 33.1008, −95.3923. It is in the PUD No. 1 of Douglas County balancing area (DOPD).
Who operates Pine Forest Solar I?
EIA-860M for August 2026 lists Pine Forest Solar I, LLC as the operator (EIA operator ID 67151). The operator is not always the owner.
Is Pine Forest Solar I a solar or a battery storage plant?
Both. Solar capacity totals 300 MW and battery storage capacity totals 200 MW.
When did Pine Forest Solar I start operating?
Its first generator began operating in October 2025, according to EIA-860M.
Sources
- EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
- EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page