Natural gasOperatingBANC

Carson Power Plant

Natural gas power plant in Sacramento County, California. 125.5 MW of nameplate capacity across 3 generators, operated by Sacramento Municipal Util Dist.

Also known as Carson Ice-Gen Project · EIA plant 7527

Analyst: free account, 1 question a day.

KP South Sacramento Hospital SolarCampbell Power PlantFRV SI Transport Solar LPCarson5 km
Open in the map
6 plants within 9.5 km, from EIA coordinates.

Key facts

Capacity
125.5 MWNameplate
Generators
3 operatingEIA-860M, August 2026
Operating since
October 1995First generator online
Operator
Sacramento Municipal Util DistEIA operator ID 16534
Grid
BANCBalancing authority BANC
Price nodes
None linkedNo verified ISO node
Location
Sacramento County, CA38.4457, −121.4624
EIA plant ID
7527EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Carson produces

Free · EIA-923

Net generation, 2025

96.0 GWh

96,038 MWh, final

Capacity factor, 2025

8.7%

2024: 9.3%

January to July 2026

14.7 GWh

Provisional

Range, 2015 to 2025

96.0–416.1

GWh a year. Low 2025, high 2015

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000556,594Not reported12 of 12
2001588,765Not reported12 of 12
2002416,857Not reported12 of 12
2003397,505Not reported12 of 12
2004412,111Not reported12 of 12
2005387,048Not reported12 of 12
2006322,965Not reported12 of 12
2007386,814Not reported12 of 12
2008373,732Not reported12 of 12
2009307,469Not reported12 of 12
2010334,46930.4%12 of 12
2011313,96828.6%12 of 12
2012388,07335.2%12 of 12
2013400,556Not reported12 of 12
2014395,45236.0%12 of 12
2015416,066Not reported12 of 12
2016380,26134.5%12 of 12
2017286,63526.1%12 of 12
2018368,11733.5%12 of 12
2019292,51626.6%12 of 12
2020226,52120.5%12 of 12
2021236,91521.5%12 of 12
2022215,80019.6%12 of 12
2023152,40613.9%12 of 12
2024103,0249.3%12 of 12
202596,0388.7%12 of 12
2026 (provisional, partial year)14,6822.3%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

CO₂, 2025

53,254

US short tons. 2024: 56,384

SO₂, 2025

0

US short tons

NOx, 2025

3

US short tons

CO₂ per MWh, calculated

0.55 t

About 1,109 lb per MWh

2 of 2 EPA units reported CO₂ in 2025 (1, 2), matched to EIA plant 7527 through the EPA–EIA crosswalk. The per-MWh rate is EPA CO₂ divided by EIA-923 net generation. The two reporting boundaries can differ.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
1Natural Gas Fired Combustion Turbine54.0October 1995
2Natural Gas Fired Combined Cycle17.5October 1995
CCCTNatural Gas Fired Combined Cycle54.0October 1995

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Sacramento Municipal Util Dist as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Carson Power Plant and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Carson

More plants operated by Sacramento Municipal Util Dist

Questions about Carson

How much power does Carson Power Plant produce?

Carson Power Plant reported 96,038 MWh (96.0 GWh) of net generation in 2025, a 8.7% capacity factor on 125.5 MW of nameplate capacity. From January to July 2026 it reported 14.7 GWh, which is provisional.

Where is Carson Power Plant?

Carson Power Plant is in Sacramento County, California, at 38.4457, −121.4624. It is in the Balancing Authority of Northern California balancing area (BANC).

Who operates Carson Power Plant?

EIA-860M for August 2026 lists Sacramento Municipal Util Dist as the operator (EIA operator ID 16534). The operator is not always the owner.

When did Carson Power Plant start operating?

Its first generator began operating in October 1995, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page