Natural gasOperatingSOCO

H Allen Franklin Combined Cycle

Natural gas power plant in Lee County, Alabama. 1,995.7 MW of nameplate capacity across 9 generators, operated by Southern Power Co.

Also known as EIA plant 7710

Analyst: free account, 1 question a day.

Goat RockBartletts FerryWalton Discover Power FacilityOliver DamNorth HighlandsH Allen Franklin Comb…5 km
Open in the map
5 plants within 15 km, from EIA coordinates.

Key facts

Capacity
1,995.7 MWNameplate
Generators
9 operatingEIA-860M, August 2026
Operating since
June 2002First generator online
Operator
Southern Power CoEIA operator ID 17650
Grid
SOCOBalancing authority SOCO
Price nodes
None linkedNo verified ISO node
Location
Lee County, AL32.6078, −85.0975
EIA plant ID
7710EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power H Allen Franklin Combined Cycle produces

Free · EIA-923

Net generation, 2025

12.1 TWh

12,061,177 MWh, final

Capacity factor, 2025

69.0%

2024: 78.5%

January to July 2026

7.16 TWh

Provisional

Range, 2015 to 2025

10.7–13.7

TWh a year. Low 2015, high 2023

Annual net generation, TWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
20021,019,310Not reported7 of 12
20031,600,305Not reported12 of 12
20042,518,886Not reported12 of 12
20051,886,431Not reported12 of 12
20062,701,133Not reported12 of 12
20073,716,876Not reported12 of 12
20085,118,213Not reported12 of 12
20097,254,275Not reported12 of 12
20107,713,18844.1%12 of 12
20114,776,22665.2%5 of 12
20122,379,41554.6%3 of 12
20138,950,99851.2%12 of 12
201410,167,61758.2%12 of 12
201510,743,08461.5%12 of 12
201611,670,86166.6%12 of 12
201712,465,36471.3%12 of 12
201812,248,56270.1%12 of 12
201912,462,63671.3%12 of 12
202012,637,16772.1%12 of 12
202111,356,99465.0%12 of 12
202211,641,02366.6%12 of 12
202313,682,16578.3%12 of 12
20241,164,90978.5%1 of 12
202512,061,17769.0%12 of 12
2026 (provisional, partial year)7,164,10570.6%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

CO₂, 2025

4.97M

US short tons. 2024: 4.84M

SO₂, 2025

25

US short tons

NOx, 2025

364

US short tons

CO₂ per MWh, calculated

0.41 t

About 825 lb per MWh

6 of 6 EPA units reported CO₂ in 2025 (1A, 1B, 2A, 2B, 3A, 3B), matched to EIA plant 7710 through the EPA–EIA crosswalk. The per-MWh rate is EPA CO₂ divided by EIA-923 net generation. The two reporting boundaries can differ.

Water use

Free · EIA-923 cooling, USGS

Withdrawal, 2024

2,502

million gallons

Consumption, 2024

1,957

million gallons

Source

Chattahoochee River

Surface, Fresh. Induced-draft tower

Watershed stress

Very low/none · 0.126

USGS SUI, HUC12 Soap Creek-Chattahoochee River

12 of 12 cooling months report withdrawal. SUI of the source river HUC12 within 3 km. Blank volumes are unreported, not zero.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
CT1ANatural Gas Fired Combined Cycle203.1June 2002
CT1BNatural Gas Fired Combined Cycle203.1June 2002
CT2ANatural Gas Fired Combined Cycle203.1June 2002
CT2BNatural Gas Fired Combined Cycle203.1June 2002
CT3ANatural Gas Fired Combined Cycle203.1May 2008
CT3BNatural Gas Fired Combined Cycle203.1May 2008
ST1Natural Gas Fired Combined Cycle213.3June 2002
ST2Natural Gas Fired Combined Cycle281.9June 2002
ST3Natural Gas Fired Combined Cycle281.9May 2008

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Southern Power Co as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query H Allen Franklin Combined Cycle and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near H Allen Franklin Combined Cycle

More plants operated by Southern Power Co

Questions about H Allen Franklin Combined Cycle

How much power does H Allen Franklin Combined Cycle produce?

H Allen Franklin Combined Cycle reported 12,061,177 MWh (12.1 TWh) of net generation in 2025, a 69.0% capacity factor on 1,995.7 MW of nameplate capacity. From January to July 2026 it reported 7.16 TWh, which is provisional.

Where is H Allen Franklin Combined Cycle?

H Allen Franklin Combined Cycle is in Lee County, Alabama, at 32.6078, −85.0975. It is in the Southern Company Services, Inc. - Trans balancing area (SOCO).

Who operates H Allen Franklin Combined Cycle?

EIA-860M for August 2026 lists Southern Power Co as the operator (EIA operator ID 17650). The operator is not always the owner.

When did H Allen Franklin Combined Cycle start operating?

Its first generator began operating in June 2002, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
  • EIA-923 cooling water 2024 and the USGS surface water supply and use index, Water years 2010-2020 (Oct 2009 to Sep 2020), mean of monthly values

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page