Natural gasOperatingSOCO

E B Harris Electric Generating Plant

Natural gas power plant in Autauga County, Alabama. 1,304 MW of nameplate capacity across 6 generators, operated by Southern Power Co.

Also known as E.B. Harris Electric Generating Plant · EB Harris Electric Generating Plant · EIA plant 7897

Analyst: free account, 1 question a day.

International Paper P…Old Hayneville Solar,…Jones BluffInternational Paper R…Black Bear Solar 1E B Harris Electric G…10 km
Open in the map
6 plants within 31 km, from EIA coordinates.

Key facts

Capacity
1,304 MWNameplate
Generators
6 operatingEIA-860M, August 2026
Operating since
June 2003First generator online
Operator
Southern Power CoEIA operator ID 17650
Grid
SOCOBalancing authority SOCO
Price nodes
None linkedNo verified ISO node
Location
Autauga County, AL32.3814, −86.5744
EIA plant ID
7897EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power E B Harris Electric Generating Plant produces

Free · EIA-923

Net generation, 2025

5.07 TWh

5,071,086 MWh, final

Capacity factor, 2025

44.4%

2024: 43.5%

January to July 2026

2.85 TWh

Provisional

Range, 2015 to 2025

4.4–7.4

TWh a year. Low 2019, high 2015

Annual net generation, TWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
20031,045,603Not reported7 of 12
20042,201,422Not reported12 of 12
20051,777,538Not reported12 of 12
20062,433,545Not reported12 of 12
20073,352,908Not reported12 of 12
20082,698,768Not reported12 of 12
20093,293,124Not reported12 of 12
20104,189,28736.7%12 of 12
20115,557,33948.7%12 of 12
20126,479,77556.6%12 of 12
20134,629,10140.5%12 of 12
20144,790,49741.9%12 of 12
20157,433,31565.1%12 of 12
20166,096,88553.2%12 of 12
20175,302,21846.4%12 of 12
20185,865,44651.3%12 of 12
20194,404,40538.6%12 of 12
20204,418,24438.6%12 of 12
20214,700,57241.1%12 of 12
20226,762,11559.2%12 of 12
20236,460,47756.6%12 of 12
20244,979,80443.5%12 of 12
20255,071,08644.4%12 of 12
2026 (provisional, partial year)2,848,96542.9%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

CO₂, 2025

2.10M

US short tons. 2024: 2.07M

SO₂, 2025

11

US short tons

NOx, 2025

175

US short tons

CO₂ per MWh, calculated

0.41 t

About 830 lb per MWh

4 of 4 EPA units reported CO₂ in 2025 (1A, 1B, 2A, 2B), matched to EIA plant 7897 through the EPA–EIA crosswalk. The per-MWh rate is EPA CO₂ divided by EIA-923 net generation. The two reporting boundaries can differ.

Water use

Free · EIA-923 cooling, USGS

Withdrawal, 2024

1,524

million gallons

Consumption, 2024

1,158

million gallons

Source

Alabama River

Surface, Fresh. Induced-draft tower

Watershed stress

Very low/none · 0.141

USGS SUI, HUC12 Haney Branch-Bear Creek

12 of 12 cooling months report withdrawal. SUI of the source river HUC12 within 3 km. Blank volumes are unreported, not zero.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
CT1ANatural Gas Fired Combined Cycle185.0June 2003
CT1BNatural Gas Fired Combined Cycle185.0June 2003
CT2ANatural Gas Fired Combined Cycle185.0June 2003
CT2BNatural Gas Fired Combined Cycle185.0June 2003
ST1Natural Gas Fired Combined Cycle282.0June 2003
ST2Natural Gas Fired Combined Cycle282.0June 2003

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Southern Power Co as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query E B Harris Electric Generating Plant and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near E B Harris Electric Generating Plant

More plants operated by Southern Power Co

Questions about E B Harris Electric Generating Plant

How much power does E B Harris Electric Generating Plant produce?

E B Harris Electric Generating Plant reported 5,071,086 MWh (5.07 TWh) of net generation in 2025, a 44.4% capacity factor on 1,304 MW of nameplate capacity. From January to July 2026 it reported 2.85 TWh, which is provisional.

Where is E B Harris Electric Generating Plant?

E B Harris Electric Generating Plant is in Autauga County, Alabama, at 32.3814, −86.5744. It is in the Southern Company Services, Inc. - Trans balancing area (SOCO).

Who operates E B Harris Electric Generating Plant?

EIA-860M for August 2026 lists Southern Power Co as the operator (EIA operator ID 17650). The operator is not always the owner.

When did E B Harris Electric Generating Plant start operating?

Its first generator began operating in June 2003, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
  • EIA-923 cooling water 2024 and the USGS surface water supply and use index, Water years 2010-2020 (Oct 2009 to Sep 2020), mean of monthly values

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page