E B Harris Electric Generating Plant
Natural gas power plant in Autauga County, Alabama. 1,304 MW of nameplate capacity across 6 generators, operated by Southern Power Co.
Also known as E.B. Harris Electric Generating Plant · EB Harris Electric Generating Plant · EIA plant 7897
Analyst: free account, 1 question a day.
Key facts
- Capacity
- 1,304 MWNameplate
- Generators
- 6 operatingEIA-860M, August 2026
- Operating since
- June 2003First generator online
- Operator
- Southern Power CoEIA operator ID 17650
- Grid
- SOCOBalancing authority SOCO
- Price nodes
- None linkedNo verified ISO node
- Location
- Autauga County, AL32.3814, −86.5744
- EIA plant ID
- 7897EIA plant page
Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.
How much power E B Harris Electric Generating Plant produces
Free · EIA-923Net generation, 2025
5.07 TWh
5,071,086 MWh, final
Capacity factor, 2025
44.4%
2024: 43.5%
January to July 2026
2.85 TWh
Provisional
Range, 2015 to 2025
4.4–7.4
TWh a year. Low 2019, high 2015
| Year | Net generation, MWh | Capacity factor | Months reported |
|---|---|---|---|
| 2000 | Not reported | Not reported | 0 of 12 |
| 2001 | Not reported | Not reported | 0 of 12 |
| 2002 | Not reported | Not reported | 0 of 12 |
| 2003 | 1,045,603 | Not reported | 7 of 12 |
| 2004 | 2,201,422 | Not reported | 12 of 12 |
| 2005 | 1,777,538 | Not reported | 12 of 12 |
| 2006 | 2,433,545 | Not reported | 12 of 12 |
| 2007 | 3,352,908 | Not reported | 12 of 12 |
| 2008 | 2,698,768 | Not reported | 12 of 12 |
| 2009 | 3,293,124 | Not reported | 12 of 12 |
| 2010 | 4,189,287 | 36.7% | 12 of 12 |
| 2011 | 5,557,339 | 48.7% | 12 of 12 |
| 2012 | 6,479,775 | 56.6% | 12 of 12 |
| 2013 | 4,629,101 | 40.5% | 12 of 12 |
| 2014 | 4,790,497 | 41.9% | 12 of 12 |
| 2015 | 7,433,315 | 65.1% | 12 of 12 |
| 2016 | 6,096,885 | 53.2% | 12 of 12 |
| 2017 | 5,302,218 | 46.4% | 12 of 12 |
| 2018 | 5,865,446 | 51.3% | 12 of 12 |
| 2019 | 4,404,405 | 38.6% | 12 of 12 |
| 2020 | 4,418,244 | 38.6% | 12 of 12 |
| 2021 | 4,700,572 | 41.1% | 12 of 12 |
| 2022 | 6,762,115 | 59.2% | 12 of 12 |
| 2023 | 6,460,477 | 56.6% | 12 of 12 |
| 2024 | 4,979,804 | 43.5% | 12 of 12 |
| 2025 | 5,071,086 | 44.4% | 12 of 12 |
| 2026 (provisional, partial year) | 2,848,965 | 42.9% | 7 of 7 |
* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.
Power prices and basis
Free accountNo verified ISO price node is linked to this plant, or its price history could not load.
Emissions
Free · EPA CAMPDCO₂, 2025
2.10M
US short tons. 2024: 2.07M
SO₂, 2025
11
US short tons
NOx, 2025
175
US short tons
CO₂ per MWh, calculated
0.41 t
About 830 lb per MWh
4 of 4 EPA units reported CO₂ in 2025 (1A, 1B, 2A, 2B), matched to EIA plant 7897 through the EPA–EIA crosswalk. The per-MWh rate is EPA CO₂ divided by EIA-923 net generation. The two reporting boundaries can differ.
Water use
Free · EIA-923 cooling, USGSWithdrawal, 2024
1,524
million gallons
Consumption, 2024
1,158
million gallons
Source
Alabama River
Surface, Fresh. Induced-draft tower
Watershed stress
Very low/none · 0.141
USGS SUI, HUC12 Haney Branch-Bear Creek
12 of 12 cooling months report withdrawal. SUI of the source river HUC12 within 3 km. Blank volumes are unreported, not zero.
Generators
Free · EIA-860M| Generator | Technology | Nameplate MW | Online since |
|---|---|---|---|
| CT1A | Natural Gas Fired Combined Cycle | 185.0 | June 2003 |
| CT1B | Natural Gas Fired Combined Cycle | 185.0 | June 2003 |
| CT2A | Natural Gas Fired Combined Cycle | 185.0 | June 2003 |
| CT2B | Natural Gas Fired Combined Cycle | 185.0 | June 2003 |
| ST1 | Natural Gas Fired Combined Cycle | 282.0 | June 2003 |
| ST2 | Natural Gas Fired Combined Cycle | 282.0 | June 2003 |
Ownership and offtake
ProOwnership and offtake are part of Pro
Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Southern Power Co as the operator, which is not always the owner.
Modeled data
ProPro adds modeled values for this plant. Everything above stays free.
Generation potential vs reported
Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.
300 analyst questions a month, plus MCP
Query E B Harris Electric Generating Plant and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.
Power plants near E B Harris Electric Generating Plant
More plants operated by Southern Power Co
Questions about E B Harris Electric Generating Plant
How much power does E B Harris Electric Generating Plant produce?
E B Harris Electric Generating Plant reported 5,071,086 MWh (5.07 TWh) of net generation in 2025, a 44.4% capacity factor on 1,304 MW of nameplate capacity. From January to July 2026 it reported 2.85 TWh, which is provisional.
Where is E B Harris Electric Generating Plant?
E B Harris Electric Generating Plant is in Autauga County, Alabama, at 32.3814, −86.5744. It is in the Southern Company Services, Inc. - Trans balancing area (SOCO).
Who operates E B Harris Electric Generating Plant?
EIA-860M for August 2026 lists Southern Power Co as the operator (EIA operator ID 17650). The operator is not always the owner.
When did E B Harris Electric Generating Plant start operating?
Its first generator began operating in June 2003, according to EIA-860M.
Sources
- EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
- EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
- EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
- EIA-923 cooling water 2024 and the USGS surface water supply and use index, Water years 2010-2020 (Oct 2009 to Sep 2020), mean of monthly values