Sowega Power
Natural gas power plant in Mitchell County, Georgia. 99.6 MW of nameplate capacity across 2 generators, operated by SOWEGA Power LLC.
Also known as EIA plant 7768
Analyst: free account, 1 question a day.
Key facts
- Capacity
- 99.6 MWNameplate
- Generators
- 2 operatingEIA-860M, August 2026
- Operating since
- June 1999First generator online
- Operator
- SOWEGA Power LLCEIA operator ID 17690
- Grid
- SOCOBalancing authority SOCO
- Price nodes
- None linkedNo verified ISO node
- Location
- Mitchell County, GA31.3869, −84.0800
- EIA plant ID
- 7768EIA plant page
Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.
How much power Sowega Power produces
Free · EIA-923Net generation, 2025
29.3 GWh
29,258 MWh, final
Capacity factor, 2025
3.4%
2024: 6.1%
January to July 2026
Not reported
Provisional. 0 of 7 months reported
Range, 2015 to 2025
29.3–120.7
GWh a year. Low 2025, high 2015
| Year | Net generation, MWh | Capacity factor | Months reported |
|---|---|---|---|
| 2000 | Not reported | Not reported | 0 of 12 |
| 2001 | 104,578 | Not reported | 8 of 12 |
| 2002 | 36,639 | Not reported | 12 of 12 |
| 2003 | 53,889 | Not reported | 12 of 12 |
| 2004 | Not reported | Not reported | 0 of 12 |
| 2005 | 3,997 | Not reported | 12 of 12 |
| 2006 | 2,185 | Not reported | 12 of 12 |
| 2007 | 35,800 | Not reported | 12 of 12 |
| 2008 | 21,760 | Not reported | 12 of 12 |
| 2009 | 4,231 | Not reported | 12 of 12 |
| 2010 | 29,789 | 2.8% | 12 of 12 |
| 2011 | 106,131 | 10.1% | 12 of 12 |
| 2012 | 118,053 | 11.2% | 12 of 12 |
| 2013 | 37,881 | Not reported | 12 of 12 |
| 2014 | 63,100 | 7.2% | 12 of 12 |
| 2015 | 120,717 | 13.8% | 12 of 12 |
| 2016 | 119,285 | 13.6% | 12 of 12 |
| 2017 | 43,452 | 5.0% | 12 of 12 |
| 2018 | 94,751 | 10.9% | 12 of 12 |
| 2019 | 111,497 | 12.8% | 12 of 12 |
| 2020 | 72,806 | 8.3% | 12 of 12 |
| 2021 | 63,232 | 7.2% | 12 of 12 |
| 2022 | 64,644 | 7.4% | 12 of 12 |
| 2023 | 77,220 | 8.9% | 12 of 12 |
| 2024 | 53,188 | 6.1% | 12 of 12 |
| 2025 | 29,258 | 3.4% | 12 of 12 |
| 2026 (provisional, partial year) | Not reported | Not reported | 0 of 7 |
* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.
Power prices and basis
Free accountNo verified ISO price node is linked to this plant, or its price history could not load.
Emissions
Free · EPA CAMPDCO₂, 2025
18,619
US short tons. 2024: 31,960
SO₂, 2025
0
US short tons
NOx, 2025
18
US short tons
CO₂ per MWh, calculated
0.64 t
About 1,273 lb per MWh
2 of 2 EPA units reported CO₂ in 2025 (CT2, CT3), matched to EIA plant 7768 through the EPA–EIA crosswalk. The per-MWh rate is EPA CO₂ divided by EIA-923 net generation. The two reporting boundaries can differ.
Water use
Free · EIA-923 cooling, USGSNo EIA cooling-water record for this plant in 2024.
Generators
Free · EIA-860M| Generator | Technology | Nameplate MW | Online since |
|---|---|---|---|
| CTG2 | Natural Gas Fired Combustion Turbine | 49.8 | June 1999 |
| CTG3 | Natural Gas Fired Combustion Turbine | 49.8 | June 1999 |
Ownership and offtake
ProOwnership and offtake are part of Pro
Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists SOWEGA Power LLC as the operator, which is not always the owner.
Modeled data
ProPro adds modeled values for this plant. Everything above stays free.
Generation potential vs reported
Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.
300 analyst questions a month, plus MCP
Query Sowega Power and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.
Power plants near Sowega Power
Questions about Sowega Power
How much power does Sowega Power produce?
Sowega Power reported 29,258 MWh (29.3 GWh) of net generation in 2025, a 3.4% capacity factor on 99.6 MW of nameplate capacity.
Where is Sowega Power?
Sowega Power is in Mitchell County, Georgia, at 31.3869, −84.0800. It is in the Southern Company Services, Inc. - Trans balancing area (SOCO).
Who operates Sowega Power?
EIA-860M for August 2026 lists SOWEGA Power LLC as the operator (EIA operator ID 17690). The operator is not always the owner.
When did Sowega Power start operating?
Its first generator began operating in June 1999, according to EIA-860M.
Sources
- EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
- EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
- EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025