WindOperatingSPP

Moorhead Wind Turbine

Wind power plant in Clay County, Minnesota. 1.4 MW of nameplate capacity across 2 generators, operated by City of Moorhead - (MN).

Also known as Moorhead · EIA plant 7855

Analyst: free account, 1 question a day.

American Crystal Suga…Centennial Generating StationUSS Buckaroo Solar LLC CSGUSS Horne South Solar LLC CSGMoorhead Wind Turbine10 km
Open in the map
6 plants within 22 km, from EIA coordinates.

Key facts

Capacity
1.4 MWNameplate
Generators
2 operatingEIA-860M, August 2026
Operating since
May 1999First generator online
Operator
City of Moorhead - (MN)EIA operator ID 12894
Grid
SPPBalancing authority SWPP
Price nodes
None linkedNo verified ISO node
Location
Clay County, MN46.8950, −96.7347
EIA plant ID
7855EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Moorhead Wind Turbine produces

Free · EIA-923

Net generation, 2025

809 MWh

809 MWh, final

Capacity factor, 2025

6.6%

2024: 10.1%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2015 to 2025

−10.3–2.5

GWh a year. Low 2023, high 2015

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
20023Not reported12 of 12
20033Not reported12 of 12
20043,080Not reported12 of 12
20052,509Not reported12 of 12
20062,985Not reported12 of 12
20072,672Not reported12 of 12
20082,661Not reported12 of 12
20092,421Not reported12 of 12
20102,25118.4%12 of 12
20112,70122.0%12 of 12
20122,35319.1%12 of 12
20131,65113.5%12 of 12
20141,64413.4%12 of 12
20152,48020.2%12 of 12
20161,41211.5%12 of 12
20171,86015.2%12 of 12
20181,52812.5%12 of 12
20191,65513.5%12 of 12
20202,21318.0%12 of 12
20211,38311.3%12 of 12
20223873.2%12 of 12
2023−10,328-84.2%12 of 12
20241,24110.1%12 of 12
20258096.6%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
8Onshore Wind Turbine0.7May 1999
9Onshore Wind Turbine0.7September 2001

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists City of Moorhead - (MN) as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Modeled curtailment

A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.

Modeled

Expected vs reported generation

Monthly modeled expected output and physical potential next to EIA-923 reported output.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Moorhead Wind Turbine and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Moorhead Wind Turbine

More plants operated by City of Moorhead - (MN)

Questions about Moorhead Wind Turbine

How much power does Moorhead Wind Turbine produce?

Moorhead Wind Turbine reported 809 MWh (809 MWh) of net generation in 2025, a 6.6% capacity factor on 1.4 MW of nameplate capacity.

Where is Moorhead Wind Turbine?

Moorhead Wind Turbine is in Clay County, Minnesota, at 46.8950, −96.7347. It is in the Southwest Power Pool balancing area (SWPP).

Who operates Moorhead Wind Turbine?

EIA-860M for August 2026 lists City of Moorhead - (MN) as the operator (EIA operator ID 12894). The operator is not always the owner.

When did Moorhead Wind Turbine start operating?

Its first generator began operating in May 1999, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • Project names from the USGS U.S. Wind Turbine Database

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page