Shelbina Power #3
Oil power plant in Shelby County, Missouri. 3.6 MW of nameplate capacity across 2 generators, operated by City of Shelbina - (MO).
Also known as EIA plant 7860
Analyst: free account, 1 question a day.
Key facts
- Capacity
- 3.6 MWNameplate
- Generators
- 2 operatingEIA-860M, August 2026
- Operating since
- April 2002First generator online
- Operator
- City of Shelbina - (MO)EIA operator ID 17035
- Grid
- AECIBalancing authority AECI
- Price nodes
- None linkedNo verified ISO node
- Location
- Shelby County, MO39.6975, −92.0535
- EIA plant ID
- 7860EIA plant page
Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.
How much power Shelbina Power #3 produces
Free · EIA-923Net generation, 2025
16 MWh
16 MWh, final
Capacity factor, 2025
0.1%
2024: 0.1%
January to July 2026
Not reported
Provisional. 0 of 7 months reported
Range, 2015 to 2025
0.0–36.0
MWh a year. Low 2023, high 2024
| Year | Net generation, MWh | Capacity factor | Months reported |
|---|---|---|---|
| 2000 | Not reported | Not reported | 0 of 12 |
| 2001 | 121 | Not reported | 12 of 12 |
| 2002 | 3 | Not reported | 12 of 12 |
| 2003 | 102 | Not reported | 12 of 12 |
| 2004 | 18 | Not reported | 12 of 12 |
| 2005 | 22 | Not reported | 12 of 12 |
| 2006 | 29 | Not reported | 12 of 12 |
| 2007 | 18 | Not reported | 12 of 12 |
| 2008 | 0 | Not reported | 12 of 12 |
| 2009 | 20 | Not reported | 12 of 12 |
| 2010 | 14 | 0.0% | 12 of 12 |
| 2011 | 30 | 0.1% | 12 of 12 |
| 2012 | 13 | 0.0% | 12 of 12 |
| 2013 | 14 | 0.0% | 12 of 12 |
| 2014 | 26 | 0.1% | 12 of 12 |
| 2015 | 18 | 0.1% | 12 of 12 |
| 2016 | 15 | 0.0% | 12 of 12 |
| 2017 | 31 | 0.1% | 12 of 12 |
| 2018 | 22 | 0.1% | 12 of 12 |
| 2019 | 8 | 0.0% | 12 of 12 |
| 2020 | 30 | 0.1% | 12 of 12 |
| 2021 | 16 | 0.1% | 12 of 12 |
| 2022 | 8 | 0.0% | 12 of 12 |
| 2023 | 0 | 0.0% | 12 of 12 |
| 2024 | 36 | 0.1% | 12 of 12 |
| 2025 | 16 | 0.1% | 12 of 12 |
| 2026 (provisional, partial year) | Not reported | Not reported | 0 of 7 |
* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.
Power prices and basis
Free accountNo verified ISO price node is linked to this plant, or its price history could not load.
Emissions
Free · EPA CAMPDNo EPA emissions units are linked to this plant.
Water use
Free · EIA-923 cooling, USGSNo EIA cooling-water record for this plant in 2024.
Generators
Free · EIA-860M| Generator | Technology | Nameplate MW | Online since |
|---|---|---|---|
| G7 | Petroleum Liquids | 1.8 | April 2002 |
| G8 | Petroleum Liquids | 1.8 | April 2002 |
Ownership and offtake
ProOwnership and offtake are part of Pro
Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists City of Shelbina - (MO) as the operator, which is not always the owner.
Modeled data
ProPro adds modeled values for this plant. Everything above stays free.
Generation potential vs reported
Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.
300 analyst questions a month, plus MCP
Query Shelbina Power #3 and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.
Power plants near Shelbina Power #3
More plants operated by City of Shelbina - (MO)
Questions about Shelbina Power #3
How much power does Shelbina Power #3 produce?
Shelbina Power #3 reported 16 MWh (16 MWh) of net generation in 2025, a 0.1% capacity factor on 3.6 MW of nameplate capacity.
Where is Shelbina Power #3?
Shelbina Power #3 is in Shelby County, Missouri, at 39.6976, −92.0535. It is in the Associated Electric Cooperative, Inc. balancing area (AECI).
Who operates Shelbina Power #3?
EIA-860M for August 2026 lists City of Shelbina - (MO) as the operator (EIA operator ID 17035). The operator is not always the owner.
When did Shelbina Power #3 start operating?
Its first generator began operating in April 2002, according to EIA-860M.
Sources
- EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
- EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page