Natural gasOperatingSOCO

Wansley Unit 9

Natural gas power plant in Heard County, Georgia. 594.1 MW of nameplate capacity across 3 generators, operated by Municipal Electric Authority - (GA).

Also known as EIA plant 7946

Analyst: free account, 1 question a day.

Hawk Road FacilityTenaska Georgia Generation FacilityYatesWansley Unit 95 km
Open in the map
5 plants within 14 km, from EIA coordinates.

Key facts

Capacity
594.1 MWNameplate
Generators
3 operatingEIA-860M, August 2026
Operating since
June 2004First generator online
Operator
Municipal Electric Authority - (GA)EIA operator ID 13100
Grid
SOCOBalancing authority SOCO
Price nodes
None linkedNo verified ISO node
Location
Heard County, GA33.4083, −85.0403
EIA plant ID
7946EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Wansley Unit 9 produces

Free · EIA-923

Net generation, 2025

2.20 TWh

2,201,110 MWh, final

Capacity factor, 2025

42.3%

2024: 66.2%

January to July 2026

2.07 TWh

Provisional

Range, 2015 to 2025

2.1–3.5

TWh a year. Low 2018, high 2024

Annual net generation, TWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004738,223Not reported10 of 12
2005638,132Not reported12 of 12
2006710,277Not reported12 of 12
2007884,213Not reported12 of 12
2008557,020Not reported12 of 12
20091,096,600Not reported12 of 12
20101,056,12421.2%12 of 12
20111,283,17225.8%12 of 12
20121,842,43736.9%12 of 12
20131,533,960Not reported12 of 12
20141,622,57132.6%12 of 12
20152,701,20654.3%12 of 12
20162,722,52554.6%12 of 12
20172,650,322Not reported12 of 12
20182,084,94940.1%12 of 12
20193,069,76959.0%12 of 12
20203,153,31160.4%12 of 12
20212,982,21157.3%12 of 12
20222,333,88744.8%12 of 12
20232,968,40957.0%12 of 12
20243,453,71366.2%12 of 12
20252,201,11042.3%12 of 12
2026 (provisional, partial year)2,073,45568.6%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

CO₂, 2025

948,173

US short tons. 2024: 1.47M

SO₂, 2025

5

US short tons

NOx, 2025

85

US short tons

CO₂ per MWh, calculated

0.43 t

About 862 lb per MWh

2 of 2 EPA units reported CO₂ in 2025 (CT9A, CT9B), matched to EIA plant 7946 through the EPA–EIA crosswalk. The per-MWh rate is EPA CO₂ divided by EIA-923 net generation. The two reporting boundaries can differ.

Water use

Free · EIA-923 cooling, USGS

Withdrawal, 2024

762

million gallons

Consumption, 2024

598

million gallons

Source

Chattahoochee River

Surface, Fresh. Induced-draft tower

Watershed stress

Very low/none · 0.129

USGS SUI, HUC12 Pink Creek-Chattahoochee River

12 of 12 cooling months report withdrawal. SUI of the source river HUC12 within 3 km. Blank volumes are unreported, not zero.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
CT1Natural Gas Fired Combined Cycle183.6June 2004
CT2Natural Gas Fired Combined Cycle183.6June 2004
ST1Natural Gas Fired Combined Cycle226.9June 2004

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Municipal Electric Authority - (GA) as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Wansley Unit 9 and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Wansley Unit 9

Questions about Wansley Unit 9

How much power does Wansley Unit 9 produce?

Wansley Unit 9 reported 2,201,110 MWh (2.20 TWh) of net generation in 2025, a 42.3% capacity factor on 594.1 MW of nameplate capacity. From January to July 2026 it reported 2.07 TWh, which is provisional.

Where is Wansley Unit 9?

Wansley Unit 9 is in Heard County, Georgia, at 33.4083, −85.0403. It is in the Southern Company Services, Inc. - Trans balancing area (SOCO).

Who operates Wansley Unit 9?

EIA-860M for August 2026 lists Municipal Electric Authority - (GA) as the operator (EIA operator ID 13100). The operator is not always the owner.

When did Wansley Unit 9 start operating?

Its first generator began operating in June 2004, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
  • EIA-923 cooling water 2024 and the USGS surface water supply and use index, Water years 2010-2020 (Oct 2009 to Sep 2020), mean of monthly values

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page