Natural gasOperatingSOCO

Chattahoochee Energy Facility

Natural gas power plant in Heard County, Georgia. 539.7 MW of nameplate capacity across 3 generators, operated by Oglethorpe Power Corporation.

Also known as EIA plant 7917

Analyst: free account, 1 question a day.

Hawk Road FacilityTenaska Georgia Generation FacilityYatesChattahoochee Energy…5 km
Open in the map
5 plants within 14 km, from EIA coordinates.

Key facts

Capacity
539.7 MWNameplate
Generators
3 operatingEIA-860M, August 2026
Operating since
February 2003First generator online
Operator
Oglethorpe Power CorporationEIA operator ID 13994
Grid
SOCOBalancing authority SOCO
Price nodes
None linkedNo verified ISO node
Location
Heard County, GA33.4072, −85.0386
EIA plant ID
7917EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Chattahoochee Energy Facility produces

Free · EIA-923

Net generation, 2025

3.70 TWh

3,696,404 MWh, final

Capacity factor, 2025

78.2%

2024: 61.7%

January to July 2026

2.33 TWh

Provisional

Range, 2015 to 2025

2.6–3.7

TWh a year. Low 2022, high 2025

Annual net generation, TWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003454,130Not reported10 of 12
2004878,320Not reported12 of 12
2005896,703Not reported12 of 12
2006965,635Not reported12 of 12
20071,507,405Not reported12 of 12
20081,430,448Not reported12 of 12
20092,206,639Not reported12 of 12
20101,543,30532.6%12 of 12
20111,931,68940.9%12 of 12
20122,575,31354.3%12 of 12
20131,682,958Not reported7 of 12
2014827,95653.3%4 of 12
20152,825,73159.8%12 of 12
20163,060,62464.6%12 of 12
20173,387,29471.6%12 of 12
20182,681,32256.7%12 of 12
20193,327,34570.4%12 of 12
20203,370,01771.1%12 of 12
20213,176,05667.2%12 of 12
20222,571,65254.4%12 of 12
20233,533,09974.7%12 of 12
20242,923,07261.7%12 of 12
20253,696,40478.2%12 of 12
2026 (provisional, partial year)2,334,99085.0%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

CO₂, 2025

1.50M

US short tons. 2024: 1.20M

SO₂, 2025

8

US short tons

NOx, 2025

113

US short tons

CO₂ per MWh, calculated

0.40 t

About 810 lb per MWh

2 of 2 EPA units reported CO₂ in 2025 (8A, 8B), matched to EIA plant 7917 through the EPA–EIA crosswalk. The per-MWh rate is EPA CO₂ divided by EIA-923 net generation. The two reporting boundaries can differ.

Water use

Free · EIA-923 cooling, USGS

Withdrawal, 2024

303

million gallons

Consumption, 2024

274

million gallons

Source

Chattahoochee River

Surface, Fresh. Induced-draft tower

Watershed stress

Very low/none · 0.129

USGS SUI, HUC12 Pink Creek-Chattahoochee River

12 of 12 cooling months report withdrawal. SUI of the source river HUC12 within 3 km. Blank volumes are unreported, not zero.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
1Natural Gas Fired Combined Cycle176.0February 2003
2Natural Gas Fired Combined Cycle176.0February 2003
3Natural Gas Fired Combined Cycle187.7February 2003

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Oglethorpe Power Corporation as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Chattahoochee Energy Facility and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Chattahoochee Energy Facility

More plants operated by Oglethorpe Power Corporation

Questions about Chattahoochee Energy Facility

How much power does Chattahoochee Energy Facility produce?

Chattahoochee Energy Facility reported 3,696,404 MWh (3.70 TWh) of net generation in 2025, a 78.2% capacity factor on 539.7 MW of nameplate capacity. From January to July 2026 it reported 2.33 TWh, which is provisional.

Where is Chattahoochee Energy Facility?

Chattahoochee Energy Facility is in Heard County, Georgia, at 33.4072, −85.0386. It is in the Southern Company Services, Inc. - Trans balancing area (SOCO).

Who operates Chattahoochee Energy Facility?

EIA-860M for August 2026 lists Oglethorpe Power Corporation as the operator (EIA operator ID 13994). The operator is not always the owner.

When did Chattahoochee Energy Facility start operating?

Its first generator began operating in February 2003, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
  • EIA-923 cooling water 2024 and the USGS surface water supply and use index, Water years 2010-2020 (Oct 2009 to Sep 2020), mean of monthly values

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page